A technology of reinforcement cages and hole-digging piles, which is applied in the direction of sheet pile walls, foundation structure engineering, construction, etc., can solve the problem that the lifting equipment cannot put down the reinforcement cages, etc., and achieve the effects of reducing engineering costs, convenient operation, and simple production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A device for manually lowering the overweight steel cage of digging piles. The structure of the device is as follows image 3 Shown: Two pressure-bearing pipes 2 and two connecting pipes 3 are connected together by four sleeves 4 to form a square frame, which is placed on the pile foundation reinforced concrete wall 1; four U-shaped slots 6 are welded symmetrically The first reinforcing stirrup 7 of the steel cage, one side of the slot 6 is welded to the longitudinal main reinforcement 8 of the steel cage, and a reinforcing steel bar 10 is welded to the adjacent slot 6; two nylon ropes 5 are respectively passed through One end of the two U-shaped card slots 6 is fixed to a pressure tube 2 and the other end is fixed to the other pressure tube 2 by a slip knot.
[0030] Both the pressure-bearing pipe 2 and the connecting pipe 3 use steel pipes with a diameter of 83 mm. The length of the pressure-bearing pipe 2 is greater than the diameter of the reinforced concrete protective...
Embodiment 2
[0036] Such as figure 1 As shown, the depth of the excavated pile is 20m, and the height of the reinforced concrete wall 1 is 0.5m~1m. The design requirement is to tie a 2m steel cage to one section, and then lower it for 2m until the steel cage reaches the designed height.
[0037] A method for manually lowering the overweight steel cage of digging piles includes the following steps:
[0038] Step 1, such as figure 1 As shown, to make a square steel tube frame, prepare four steel tubes with a diameter of 83mm, two of which are pressure-bearing pipes 2 longer than the diameter of the reinforced concrete wall 1, and the other two lengths are slightly smaller than the diameter of the reinforced concrete wall 1 for connection Tube 3, cut the ports of the four casing pipes 4 into inner arcs and divide them into two pairs. The ends of each pressure-bearing pipe 2 are welded symmetrically with a pair of casing pipes 4, and then the connecting pipe 3 is inserted into the casing pipe 4, Th...