Method for using waste material to prepare heat insulating wall
A waste material and thermal insulation wall technology, which is applied in applications, ceramic products, household appliances, etc., can solve the problems of poor mechanical properties of foam concrete, long preparation time, space occupation, etc., and achieve good rigidity, improved physical properties, and low energy consumption. short-term effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0010] Example 1: Take 23 kg of cement, 15 kg of sand, 1 kg of cement foam agent, 30 kg of lime, 10 kg of perlite, 50 kg of water, and 58.6 kg of wood chips according to 55% of foam concrete, 25% of waste materials, and 20% of additives , 39.1 kg of polypropylene fiber, 7.8 kg of early strength agent; during preparation, mix and stir cement, sand, lime, perlite, and water evenly, then add waste materials and additives, continue to mix and stir evenly, and prepare slurry; Add 25 kg of water to the foaming agent, mix it into a solution, and then foam it with high-speed stirring; mix and stir the foam and slurry evenly, and shape it into a wallboard, and set a glass fiber mesh cloth in the wallboard, and after curing Insulate the walls.
Embodiment 2
[0011] Example 2: Take 25 kg of cement, 18 kg of sand, 2 kg of cement foam, 33 kg of lime, 14 kg of perlite, 55 kg of water, and 55.1 kg of broken glass according to 60% of foam concrete, 22.5% of waste materials, and 17.5% of additives , 36.8 kg of polypropylene fiber, 6.1 kg of early strength agent; during preparation, mix and stir cement, sand, lime, perlite, and water evenly, then add waste materials and additives, continue to mix and stir evenly, and prepare slurry; Add 52 kg of water to the foaming agent, mix it into a solution, and then foam it with high-speed stirring; mix the foam and slurry evenly, and shape it into a wallboard, and set a glass fiber mesh cloth in the wallboard, and after curing Insulate the walls.
Embodiment 3
[0012] Embodiment 3: get 30 kilograms of cement, 22 kilograms of sand, 4 kilograms of cement foaming agents, 36 kilograms of lime, 18 kilograms of perlite, 60 kilograms of water, and 52.3 kilograms of straw according to 65 percent of foamed concrete, 20 percent of waste materials, and 15 percent of additives. 34.3 kg of polypropylene fiber, 4.9 kg of early strength agent; during preparation, mix and stir cement, sand, lime, perlite, and water evenly, then add waste materials and additives, continue mixing and stirring to obtain a slurry; Add 108 kg of water to the foaming agent, mix it into a solution, and then foam it with high-speed stirring; mix and stir the foam and slurry evenly, and shape it into a wallboard, and set a glass fiber mesh cloth in the wallboard, and get Insulated walls.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More