Construction method for water-saturated soft soil foundations
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- SUZHOU XIANGSHENG CONSTR ENG CO LTD
- Publication Date
- 2015-09-09
Abstract
Description
technical field
[0001] The invention relates to a soft soil foundation construction method. Background technique
[0002] Low consolidation degree of saturated soft soil foundation, long construction period, and environmental pollution have always been difficult problems in the construction of soft soil foundation consolidation degree, which have become the main factors affecting the service life of saturated soft soil foundation. Contents of the invention
[0003] The object of the present invention is to provide a water-saturated soft soil foundation construction method with remarkable reinforcement effect, shortened construction period, energy saving and environmental protection, and low noise.
[0004] Technical solution of the present invention is:
[0005] A construction method for saturated soft soil foundation is characterized in that it comprises the following steps:
[0006] (1) Construction preparation stage
[0007] For the saturated soft soil foundation, th...