A construction method of pre-embedded eps block on the cast-in-place concrete roof of a large underground garage
A technology for concrete roofs and underground garages, which is applied in artificial islands, water conservancy projects, building types, etc., can solve the problems of large underground garages, shortened construction periods, and slow concrete finished products, so as to shorten the construction period, save engineering costs, and facilitate construction. The effect of fast progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0021] Example: such as Figure 1-3 As shown, a large underground garage cast-in-situ concrete roof pre-embedded EPS block construction method of the present invention includes EPS block 1, concrete 2, first C25 fine stone concrete block 3, top layer steel mesh 4, binding iron wire 5, the first Two C25 fine stone concrete blocks 6 and the bottom reinforcement mesh 7; the bottom reinforcement mesh 7 is arranged on the bottom layer of the concrete 2, and the top layer reinforcement mesh 4 is arranged on the top layer of the concrete 2, and the top layer reinforcement mesh 4 is connected with the bottom layer of the concrete 2. An EPS block 1 is arranged between the bottom reinforcement mesh 7, the bottom sides of the EPS block 1 are supported by the second C25 fine stone concrete block 6, and the top middle of the EPS block 1 is supported by the first C25 fine stone concrete block 6. The stone concrete block 3 is connected to the top layer of reinforcement mesh 4;
[0022] The ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 