A crushing method for bauxite waste slag high-pressure roller mill
A high-pressure roller mill and high-pressure roller mill technology, applied in grain processing and other directions, can solve the problems of low production efficiency, inability to meet production needs, and low total output ratio.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0009] Adjust the gap between the high-pressure roller mill movable roller 6 and the fixed roller 5 of the high-pressure roller mill 13 to be 10mm; the hydraulic system working pressure of the high-pressure roller mill is 16MPa; The height of the warehouse 3 before grinding is controlled at 8300mm; Open the bucket lift 11 of the fine material, start the motor of the hydraulic station 7 of the high pressure roller mill, and the oil pressure reaches 16Mpa; Start the motor of the thin oil station 8 of the high pressure roller mill for 20 seconds , and then start the main motor of the high-pressure roller mill 13; open the rod valve 4, start the bucket lifter 2 for entering the pre-grinding bin; open the belt 14; The bauxite slag 1 with the alumina weight content / silicon dioxide weight content ratio of 2.7 is introduced into the belt 14, and the feeding rate is 72t / h, and the belt conveys the bauxite slag into the feed of the bucket elevator 2 used in the pre-grinding silo. The di...
Embodiment 2
[0011] Adjust the gap between the movable roller and the fixed roller of the high-pressure roller mill to 11mm; the working pressure of the hydraulic system of the high-pressure roller mill is 17MPa; the upper inlet of the high-pressure roller mill is equipped with a pre-grinding warehouse, and the pre-grinding warehouse The height of the storage position is controlled at 8000mm; open the bucket lift of the fine material, start the motor of the hydraulic station 7 of the high pressure roller mill, the oil pressure reaches 17Mpa; start the motor of the thin oil station of the high pressure roller mill for 20 seconds, and then start the high pressure roller mill The main motor of the machine; open the rod valve, start the bucket lift used in the front bin of the grinding; open the belt; the particle size is ≤ 25mm, the water weight content is 5.5%, the alumina weight content is 55±3%, the alumina weight content / dioxide The bauxite waste slag with a silicon weight content ratio ...
Embodiment 3
[0013] Adjust the gap between the movable roller and the fixed roller of the high-pressure roller mill to 10mm; the working pressure of the hydraulic system of the high-pressure roller mill is 15MPa; the upper inlet of the high-pressure roller mill is equipped with a pre-grinding warehouse, and the pre-grinding warehouse The height of the bin is controlled at 7500 mm; open the bucket lift of the fine material, start the motor of the hydraulic station 7 of the high pressure roller mill, the oil pressure reaches 15Mpa; start the motor of the thin oil station of the high pressure roller mill for 20 seconds, and then start the high pressure roller The main motor of the mill; open the rod valve, start the bucket lift used for entering the mill front bin; open the belt; the particle size is ≤ 25mm, the moisture content is 4.8%, the alumina weight content is 55±3%, and the alumina weight content / 2 The bauxite slag with a weight content ratio of silicon oxide of 2.7±0.3 is introduced...