Large pile foundation construction method
A construction method and pile foundation technology, which is applied in the direction of foundation structure engineering, excavation, sheet pile wall, etc., can solve the problems of unfavorable construction and production, occupying the effective space of transport vehicles, and high transportation cost of casing, and achieves convenient disassembly and transportation, The effect of convenient pile foundation construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be described in detail below so that those skilled in the art can implement it after referring to this specification.
[0027] A kind of large-scale pile foundation construction method, comprises the following steps:
[0028] Step 1. Preparation before drilling: Level the site, measure the position of the pile holes, set up mud pools and mud circulation grooves, and lay a drilling platform for supporting the drilling rig on the construction site according to the plane position of the building pile foundation and the drilling sequence shelf;
[0029] Step 2. Embedding the casing: After drilling to the buried depth with the rotary drilling rig, install the casing driver on the rotary drilling rig, lift the casing, align the hole position, and lower the rotating arm to install the casing; among them, as figure 1 As shown, the casing is composed of a plurality of first casing walls 1 and a plurality of second casing walls 2 which can be intersect...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
