Construction method for fast restoring road traffic in construction of underground project
A technology for rapid restoration and underground engineering, applied in water conservancy engineering, infrastructure engineering, excavation, etc., can solve problems such as inconvenience of traffic, achieve the effect of fast road traffic, solve conflicting problems, and fast loading and unloading
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0017] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0018] A construction method for quickly recovering road traffic in underground engineering construction, comprising the following steps:
[0019] 1). Excavate the foundation pit in layers at the design position of the foundation pit, and set up an underground continuous wall along the inner wall of the foundation pit as the main enclosure structure of the foundation pit; use an excavator to clear the existing road surface at the set position of the foundation pit , and then dig a certain depth of earthwork, excavate the underground diaphragm wall installation deep groove along the periphery of the foundation pit. For waterproofing, I-steel joints are used between the various grooves of the underground diaphragm wall. In addition, multiple dewatering wells are drilled in the foundation pit, and water pipes a...