Construction method of prefabricated T-beam waterproof layer
A construction method and waterproof layer technology, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of bridge deck waterproof construction difficulties and high costs, and achieve the effects of ensuring concrete quality, reducing mechanical costs, and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] A kind of construction method of prefabricated T-beam waterproof layer, is characterized in that: comprise the steps:
[0022] ① Manufacture of hoisting trolley: First, use 83mm and 50mm hot-rolled seamless steel pipes 2 and 3 to make a simple truss. The working platform at the lower part of the truss is made of channel steel as frame 5, and a 12mm thick steel plate with an area equal to the channel steel frame is welded on the frame 4. For ease of movement, 4 wheels 6 are welded under the frame. An I-beam is welded on the top of the truss to make the track 1, and a 1t electric hoist 7 is installed on the track. Equipped with a trolley 8 and a distribution box for loading concrete with the trolley. The electric hoist can lift the trolley to move up and down, forward and backward, and deliver concrete to the bridge deck; (such as figure 1 , 2 , 3 shown)
[0023] ②During construction, first put the hoisting trolley in place and fix it; (such as Figure 4 shown)
[...