Installation method of caisson
An installation method and caisson technology, applied in the direction of caisson, building, infrastructure engineering, etc., can solve the problems of low construction work efficiency, large impact on the surrounding environment, high work intensity, etc., to reduce manual workload, reduce construction costs, The effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] A caisson installation method, the first step is to process the caisson foundation groove, so that the caisson and the foundation can be effectively connected; the second step, after the caisson foundation groove is formed, use bagged sand to adjust the positions that need to be processed according to the actual situation of the construction site The foundation is filled and leveled, and the caisson is positioned and initially installed; the third step is the jacking and leveling of the caisson, and the jacking of the caisson is separated from the foundation bed; the fourth step is temporary sealing around the caisson; The fifth step is to use a booster pump to grout the bottom of the caisson through the grouting holes reserved at the bottom of the caisson to form the back-laid caisson foundation. After the mortar has formed strength, remove the jacking mechanism and grout the inside of the jacking pipe; The sixth step is to dig out the temporary sealing structure around...
Embodiment 2
[0019] A caisson installation method, the first step is to process the caisson foundation groove, so that the caisson and the foundation can be effectively connected; the second step, after the caisson foundation groove is formed, use bagged sand to adjust the positions that need to be processed according to the actual situation of the construction site The foundation is filled and leveled, and the caisson is positioned and initially installed; the third step is the jacking and leveling of the caisson, and the jacking of the caisson is separated from the foundation bed; Block stones and bagged concrete are used for temporary sealing around the caisson; in the fifth step, a pressurized pump is used to grout the bottom of the caisson through the grouting hole reserved at the bottom of the caisson to form a back-laid caisson foundation. After the mortar has formed strength, it is removed jacking mechanism, and grouting the inside of the jacking pipe; the sixth step is to dig out t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com