Dual-target-optimization-based dynamic timing method for urban traffic signal lamp
A technology for urban traffic and signal lights, applied in the field of dynamic timing of traffic lights, can solve problems such as uncertainty, time-varying nonlinearity, and inability to adjust and control signal lights
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0057]The traffic light signal timing scheme at single-point intersections is mainly to adjust the signal period and green signal ratio of the intersection signal lights to achieve the purpose of safely and orderly diverting traffic flow and reducing the delay time and parking times of vehicles at the intersection. However, it should be noted that although the increase of the green signal ratio of a certain signal phase improves the traffic capacity of this phase, it will reduce the traffic capacity of other signal phases at the intersection, and the impact on the traffic capacity of the entire intersection is limited. , so only by reasonably balancing the green signal ratio of each phase can the traffic capacity of the entire intersection be improved. Similarly, too short a signal period can easily lead to frequent alternation of roa...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com