Composite bamboo floor and preparing method thereof
一种竹地板、地板的技术,应用在地板覆盖、化学仪器和方法、机械设备等方向,能够解决侵害、腐蚀、重组竹材料尺寸稳定性差等问题,达到生产成本降低、降低成本、浸胶和热压时间缩短的效果
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0081] The preparation method of composite bamboo floor comprises the following preparation steps:
[0082] (1) Floor panel prefabrication: Weave the bamboo fiber strip connector 02 with strength in the non-parallel direction of the bamboo fiber strip across the bamboo fiber strip 01 with a thickness of 1 mm and a width of 1 mm to form a bamboo fiber strip weaving curtain, and weave the bamboo fiber strip The woven curtain is impregnated with the first thermosetting resin to obtain a prefabricated floor panel; the width of the bamboo fiber strip woven curtain is 0.6-2m;
[0083] (2) Drying: Send the prefabricated board of the floor surface board to dry to a moisture content of 6%, and obtain a dry board of the floor surface board;
[0084] (3) Core board preparation;
[0085] (4) Hot pressing: Place the drying plate of the floor surface board on the top of the core board, and press it at a hot pressing pressure of 3Mpa / cm 2 170 DEG C of hot-pressing temperature is carried ou...
Embodiment 2
[0091] The preparation method of composite bamboo floor comprises the following preparation steps:
[0092] (1) Floor panel prefabrication: Weave the bamboo fiber strip connector 02 with strength in the non-parallel direction of the bamboo fiber strip across the bamboo fiber strip 01 with a thickness of 4mm and a width of 10mm to form a bamboo fiber strip weaving curtain, and weave the bamboo fiber strip The woven curtain is impregnated with the first thermosetting resin to obtain a prefabricated floor panel; the width of the bamboo fiber strip woven curtain is 2m;
[0093] (2) Drying: Send the prefabricated board of the floor surface board to dry until the moisture content is 10%, and obtain the drying board of the floor surface board;
[0094] (3) Core board preparation;
[0095] (4) Hot pressing: Place the drying plate of the floor surface board on the top of the core board, and press at a hot pressing pressure of 6Mpa / cm 2 1. Hot pressing at 120°C for a hot pressing time...
Embodiment 3
[0100] The preparation method of composite bamboo floor comprises the following preparation steps:
[0101](1) Floor panel prefabrication: Weave the bamboo fiber strip connector 02 with strength in the non-parallel direction of the bamboo fiber strip across the bamboo fiber strip 01 with a thickness of 2 mm and a width of 15 mm to form a bamboo fiber strip weaving curtain, and weave the bamboo fiber strip The woven curtain is impregnated with the first thermosetting resin to obtain a prefabricated floor panel; the width of the bamboo fiber strip woven curtain is 1.5m;
[0102] (2) Drying: Send the prefabricated board of the floor surface board to dry to a moisture content of 8%, and obtain a dry board of the floor surface board;
[0103] (3) Core board preparation;
[0104] (4) Hot pressing: Place the drying plate of the floor surface board on the top of the core board, and press the hot pressing pressure at 5Mpa / cm 2 140 DEG C of hot-pressing temperature are carried out hot...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com