Check patentability & draft patents in minutes with Patsnap Eureka AI!

Construction method for pouring composite steel pipe column core concrete and composite steel pipe column

A construction method and technology of steel pipe columns, applied in the processing of building materials, columns, pier columns, etc., can solve the problems of being easily affected by bad weather and high cost of high-altitude pouring, so as to ensure the construction quality, speed up the construction progress, and reduce the impact Effect

Inactive Publication Date: 2016-10-12
合肥慧林建材有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The high-altitude pouring cost of the high-throw vibration-free concrete pouring construction method is relatively high, and the existing technology has the intersection of steel structure hoisting and civil engineering reinforced concrete pouring procedures, and the construction progress of civil engineering restricts the construction progress of steel structures; moreover, this method is very easy. Affected by bad weather, construction cannot be carried out in strong winds or rainstorms. In order to improve the utilization rate of the tower crane and not directly affect the construction progress of the project, the project generally arranges night construction. There are great safety hazards such as falling from high altitudes, object strikes, and mechanical injuries.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for pouring composite steel pipe column core concrete and composite steel pipe column

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0024] Such as figure 1 As shown, the construction method for concrete pouring of the composite column steel pipe column core of the present application, an implementation thereof, includes the following steps:

[0025] Step 102: Open a pouring hole on the side wall of the steel pipe column to match the pump pipe, and the location of the pouring hole is higher than the upper floor. The steel pipe column of the present application may be an ordinary steel pipe column, or may be provided with a steel skeleton on the outer wall, that is, it may be a rigid laminated steel pipe column. A ring reinforcing plate can be arranged around the pouring hole. The reinforcing plate can be arranged on the inner wall of the steel pipe column, and can also be arranged on the outer wall of the steel pipe column.

[0026] Step 104: install the steel pipe column and build the upper floor, insert the pump pipe into the pouring hole on the upper floor, and pump concrete to pour the lower steel pip...

Embodiment 2

[0035] Embodiment 2 is a specific application example of the present application. Open pouring and tamping holes on the side wall of the steel pipe column, and segment the steel pipe column according to the convenience of construction. The segmented position of the steel pipe column is about 1.3m above the floor level, so choose the side of the steel pipe column at a distance of about 1.01m from the floor level. Take a pouring hole with a diameter of 180mm, and fully weld a steel plate with an outer diameter of 450mm at the same wall thickness at the opening inside the steel pipe column for structural reinforcement. When pouring the column core concrete, use the pump pipe to extend into the pouring hole for natural pumping. In order to ensure the quality of vibration, the pouring operation is divided into two times. The first operation is poured to half the storey height (about 2 meters), the pump pipe is drawn out, and the concrete vibrator is inserted into the pouring hole t...

Embodiment 3

[0037] The steel pipe column of the composite column of the present application, one embodiment thereof, comprises a steel pipe column and a pouring hole, the pouring hole is set on the side wall of the steel pipe column, the size of the pouring hole is matched with the pump pipe, and after the steel pipe column is installed, The position of the pouring hole is higher than the upper floor, so that standing on the upper floor, pouring concrete from the pouring hole to the steel pipe column of the lower floor.

[0038] In one embodiment, the length of the steel pipe column is twice the height of the building, and matching pouring holes are provided above each floor slab.

[0039] In one embodiment, an annular reinforcing plate may also be provided around the ramming hole to increase the strength around the ramming hole. The reinforcing plate can be arranged on the inner wall of the steel pipe column, and can also be arranged on the outer wall of the steel pipe column. In this e...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The application discloses a construction method for concrete pouring of a composite column steel tube column core and a composite column steel tube column. It includes: opening a pouring hole on the side wall of the steel pipe column to match the pump pipe, and the position of the pouring hole is higher than the upper floor; installing the steel pipe column and building the upper floor, inserting the pump pipe into the pouring hole on the upper floor, Concrete is pumped to pour the lower steel pipe column core. The application also discloses a superimposed column steel pipe column. The workers in this application can work on the floor, which avoids the risk of high-altitude operations and tower cranes lifting the hopper at night, and reduces the impact of strong winds on the construction progress of the project, speeding up the construction progress; The steel pipe column core concrete, the wall column and the floor concrete are poured at the same time at the same time. The column core concrete does not need to use relatively high-cost high-throw vibration-free concrete, which not only ensures the construction quality, but also reduces the cost.

Description

technical field [0001] The present application relates to the field of building construction, and in particular to a construction method for concrete pouring of a composite steel pipe column core and a composite steel pipe column. Background technique [0002] In the design of super high-rise buildings, in order to reduce the size and weight of structural columns and increase the effective space and area, designers often design stiff steel pipes inside or on the surface of structural columns to increase the rigidity and strength of structural columns. But in the construction of this kind of rigid steel pipe laminated column, the pouring of the column core concrete has become a construction problem. [0003] In the prior art, the construction method of pouring steel pipe column core concrete adopts the construction method of high-throw vibration-free concrete pouring, that is, the method of manually hoisting the work platform by using a steel structure (or erecting the work p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04C3/34E04G21/00E04G21/02
CPCE04C3/34E04G21/00E04G21/02
Inventor 刘伍
Owner 合肥慧林建材有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More