Water drive reservoir natural water invasion, water injection and production balance state determining method
A technology of balance state and determination method, which is applied in the direction of instruments, data processing applications, calculations, etc., and can solve problems such as coordination and balance that are rarely involved and have no theoretical basis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0119] The reservoir started to be put into production in April 1992. The original reservoir pressure was 21.86MPa, and the reservoir saturation pressure was 17.2MPa. Water injection began in August 1995. The energy of the natural water body in the reservoir is relatively sufficient, and the volume of the natural water body is about 35% of the reservoir volume. times, the current reservoir pressure is 19.84MPa, the total number of water injection wells is 17, the total number of production wells is 95, the ratio of injection-production wells is 0.179 (1:5.587), the recovery degree is 44.04%, and the comprehensive water cut is 79.83%, all oil wells have been pumped. According to the existing production history data, the relationship between the average single-well liquid production index and the average single-well water absorption index of the reservoir with water cut is as follows:
[0120] J L = 29.65 - ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com