Unlock instant, AI-driven research and patent intelligence for your innovation.

A power system dispatching operation control method based on power supply reliability

A power system scheduling and operation control technology, applied in information technology support systems, electrical components, circuit devices, etc., can solve the problems of incomplete intelligent reasoning process, unfavorable expansion, modification, and difficulty in user interaction, so as to facilitate expansion and modification. , the effect of small load loss and easy interaction

Active Publication Date: 2019-11-19
北京中恒博瑞数字电力科技有限公司 +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the current intelligent reasoning process is not comprehensive, and cannot provide the optimal operation based on the real-time operation of the entire power grid, and it is not conducive to expansion and modification, and it is difficult to achieve interaction with users

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A power system dispatching operation control method based on power supply reliability

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] Such as figure 1 As shown, this power system dispatching operation control method based on power supply reliability includes the following steps:

[0029] (1) Start inputting the purpose of operation;

[0030] (2) Select the corresponding operating equipment;

[0031] (3) Select the specific operation of the device;

[0032] (4) Carry out five-defense verification;

[0033] (5) Judging the switching state of the circuit breaker, if the circuit breaker is disconnected, step (6) is performed, otherwise step (7) is performed;

[0034] (6) Analysis of power outage range, jump to step (8);

[0035] (7) Judging whether the two sides of the circuit breaker have the same power supply, if so, perform step (9), otherwise perform step (11);

[0036] (8) judge whether there is busbar power loss, if exist, then execute step (16), if do not exist execute step (12);

[0037] (9) Power flow calculation;

[0038] (10) Whether there is an overload device, if so, step (12) is perfo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an electric power system electric power system dispatching operation control method based on power supply reliability. The method includes the steps of (1), starting inputting an operation purpose; (2), selecting corresponding operation equipment; (3), selecting specific operations of the equipment; (4) performing five-prevention verification; (5), judging the switching state of a breaker; (6), analyzing a power failure range, and skipping to the step (8); (7) judging whether the same power supply is located on two sides of the breaker or not; (8), judging whether bus power loss exists or not; (9) performing power flow calculation; (10), judging whether overload equipment exist or not; (11), judging whether a loop closing condition is satisfied or not; (12), analyzing overload bus; (13), performing transfer load balance analysis; (14), analyzing a power supply path; (15), judging whether same-power-point power supply paths of a station exist or not; (16), judging whether a power point exists on the upper level or not and whether the voltage level of the power point is larger than and equal to the voltage level of the power-loss bus or not; (17), performing load shedding; (18), analyzing the optimal scheme of an operation sequence; (19), outputting the operation sequence.

Description

technical field [0001] The invention belongs to the technical field of power grid dispatching, and in particular relates to a power system dispatching operation control method based on power supply reliability. Background technique [0002] The intelligent reasoning of power grid dispatching operation is mainly based on power safety regulations, dispatching regulations and other electrical operation specifications, according to the purpose of operation and the current operating conditions of the power grid, simulate the operation ideas of the dispatcher, and use safety verification and power supply reliability analysis to reason Generate a sequence of operations. To simulate this process, relevant information must be standardized and normalized. Computer language can describe and analyze the operation process, and achieve the expected operation results through algorithm control. [0003] In order to ensure the reliability of the grid power supply, the grid power supply mod...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/00
CPCG06Q10/0631G06Q50/06H02J3/00Y04S10/50
Inventor 周兴华郭玉杰仇向东袁成勇龚仁敏蔡正勇
Owner 北京中恒博瑞数字电力科技有限公司