Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model

A technology for tunnel construction and progress management, applied in the field of information technology, can solve the problems of inconspicuous and intuitive progress display, inconvenient data statistical analysis, and low degree of automation, so as to reduce input workload, reduce statistical analysis workload, and reduce labor. the effect of strength

Inactive Publication Date: 2017-02-08
CHINA RAILWAY DESIGN GRP CO LTD
View PDF1 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the display and management of tunnel construction progress in my country mainly adopts reports and two-dimensional horizontal line graphics. The data collection is standardized, the degree of automation is

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model
  • Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model
  • Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The management system and management method of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0042] Such as figure 1 As shown, the railway tunnel construction progress management system based on 3DGIS and engineering three-dimensional model of the present invention includes: user management module, actual progress data acquisition module, construction plan module, three-dimensional image progress display module, statistical analysis module and log recording module.

[0043] The user management module is used for user login, logout, personnel management and authority configuration. in:

[0044] User login means that the user enters the user name and password to log in to the system. Illegal accounts cannot log in to the system. The system searches from the database user table according to the user name and password entered by the user. If the match is successful, the system is logged in;

[0045] Logout means t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a railway tunnel construction progress management system based on 3DGIS and an engineering 3D model. The system comprises a user management module, a practical progress data collection module, a construction group planning module, a 3D image progress display module, a statistical analysis module, a progress early-warning module and a log recording module; the practical progress data collection module has data filling, data checking and warehousing functions; the construction group planning module can make and record plans of a construction group of a construction site; the 3D image progress display module has 3D scene introduction, tunnel construction site model introduction, 3D roaming and progress display functions; the statistical analysis module can make statistical analysis on progress data and output a statistical report; the progress early warning module has early-warning staff configuring and short message prompting functions; and the log recording module can record user login information, progress filling information and checking information in real time. According to the invention, elaborate and 3D visualized management of the railway tunnel construction progress can be realized.

Description

technical field [0001] The invention belongs to the technical field of informationization of railway and urban rail transit construction, and in particular relates to a railway tunnel construction progress management system and management method based on 3DGIS and engineering three-dimensional models. Background technique [0002] With the rapid development of railway infrastructure construction, there are a lot of tunnels in the railways under construction and proposed to be built, and there are a lot of long tunnels and extra long tunnels. At present, the display and management of tunnel construction progress in my country mainly adopts reports and two-dimensional horizontal line graphics. The data collection is standardized, the degree of automation is low, the current situation is poor, the data granularity is coarse, there are difficulties in data collection, inconvenient data statistics and analysis, and the progress display is not vivid. intuitive issues. The continuo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06
CPCG06Q10/0633
Inventor 宁新稳韩祖杰王华赵文刘小龙范登科王娇黄漪
Owner CHINA RAILWAY DESIGN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products