Aluminum mixing furnace group for matching aluminum continuous casting and rolling production line
A continuous casting and rolling, mixing furnace technology, applied in metal rolling, casting equipment, casting melt container, etc., can solve the problems of hydraulic cylinder collision, affecting free access to the charging side well area, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0045] Figure 4 It shows the working sequence diagram of the furnace group with liquid-solid metal 90:10 charging. As shown in the figure, the No. 1 aluminum mixed furnace completes the dumping cycle of about 2 hours and enters the process of "cleaning furnace, charging, working, The preparation cycle consisting of "aluminum mixing furnace ready for pouring" takes about 7.16 hours. After the dumping cycle of the No. 1 aluminum mixing furnace, the No. 2 aluminum mixing furnace, the No. 3 aluminum mixing furnace and the No. 4 aluminum mixing furnace are successively put into the dumping cycle, and enter their respective preparation cycles after their respective dumping cycles are over. The dumping cycles of No. 1, No. 2, No. 3 and No. 4 aluminum mixing furnaces are successive, realizing continuous supply of molten aluminum. 38 minutes before the end of the dumping cycle of the No. 4 aluminum mixing furnace, the preparation cycle of the No. 1 aluminum mixing furnace has been co...
example 2
[0047] Figure 5 It shows the working sequence diagram of the furnace group with liquid-solid metal 85:15 charging. As shown in the figure, the duration of the pouring cycle of the aluminum mixing furnace remains unchanged, while the preparation cycle decreases due to the decrease in the proportion of liquid in the liquid-solid metal charge. Extended. Similarly, the dumping cycles of No. 1, No. 2, No. 3 and No. 4 aluminum mixing furnaces are successive, realizing continuous supply of molten aluminum. 19 minutes before the end of the dumping cycle of the No. 4 aluminum mixing furnace, the preparation cycle of the No. 1 aluminum mixing furnace has ended, and it is in a state where it can be put into the dumping cycle again. That is, in this case, the overall cycle is expected to have a buffer time of 19 minutes between the end of the previous preparation cycle and the start of the next pouring cycle for each aluminum mixing furnace, as Figure 5 shown.
[0048] The electrolyt...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


