A method for early strength, anti-cracking and anti-freezing of concrete floor slabs in winter construction

A concrete and floor slab technology, applied in the processing of building materials, construction, building structure, etc., can solve the problems of long residence time, rapid loss of concrete slump, increase of concrete, etc., to meet the fluidity requirements, avoid Floor cracks, the effect of improving early strength

Active Publication Date: 2019-01-29
南京友西科技集团股份有限公司
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] For the floor pouring of reinforced concrete buildings, especially in the winter when the temperature is low, the strength of the floor concrete increases slowly. Due to various reasons, the cracking of the concrete floor is more prominent, which is a major problem in construction. In order to improve the early stage of concrete Strength, usually by adding accelerators to concrete, but after adding accelerators, the slump loss of concrete is faster. If the transportation distance is long and some unforeseen factors are added, stagnation often occurs. If the time is too long, some stay for as long as four, five hours or even longer
In this case, due to the small slump of concrete, inappropriate methods such as adding water are often used to increase the slump of concrete, which has a very adverse effect on the construction quality of concrete.
[0003] Adding early strength agents (commonly used are sodium sulfate, triethanolamine, etc.) , these factors will lead to cracking of floor concrete

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] A multi-storey commercial and residential building, the floor area of ​​each floor is 987.9m 2 , book C30 commercial concrete 250m 3 , the temperature at that time was 5-10°C, the concrete transportation distance was 17km, the traffic along the way was heavy, and it took 40-80 minutes from the concrete mixing station to the construction site.

[0026] The method for early strength anti-crack and anti-freezing of the concrete floor slab winter construction of the present embodiment is carried out according to the following steps:

[0027] (1) Sodium sulfate early-strength agent has been added to the commercial concrete, and the amount of sodium sulfate equivalent to 0.3% of the weight of cement in the concrete belongs to low dosage;

[0028] (2) After the concrete floor slab is poured, bricks shall be laid around to retain water, and a 15m 3 One water tank is used to prepare a curing aqueous solution with a weight concentration of 3% sodium sulfate. After the floor con...

Embodiment 2

[0030] A three-story factory building, the floor area of ​​each floor is 2130m 2 , booked C35 ordinary pumping commercial concrete 640m 3 , the transportation distance is 25km, and it takes about 60-80 minutes. At that time, the temperature is 4-8°C, and no early strength agent is used in the concrete batching;

[0031] After the concrete pouring is completed, lay bricks around the floor to retain water, and prepare a 15m 3 One water tank, prepare a curing aqueous solution with a mass concentration of 0.05% triethanolamine as the curing water for the floor concrete, store the water at a height of 1-1.2 cm, keep it for 7 days, and use tap water for later maintenance.

Embodiment 3

[0033] A high-rise commercial and residential building, the floor area of ​​each floor is 1500m 2 , ordered 350m 3 Pumping concrete, the temperature at that time was 3-7°C, and the concrete transportation distance was 26km. Since the construction was located in the city center, the traffic jam was serious. It took more than 1.5 hours from the mixing station to the construction site. No early strength agent was added to the concrete. When pouring concrete for the floor slab, use 3cm thick wooden boards to surround it to block water, and the construction site has 15m 3 One water tank is used to prepare a mixed solution of 0.02% triethanolamine and 3% sodium sulfate by weight as the curing water for floor concrete.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of concrete construction, and particularly relates to a method for early strength, crack control and antifreezing of a concrete floor during winter construction. The method comprises the steps that after a concrete mixture is subjected to floor pouring, bricks or other materials are laid around the floor for blocking, curing water is prepared in a container and is formed by adding early strength components or early strength components and antifreezing components into tap water, the curing water keeps immersing the floor, and curing is carried out for at least seven days. According to the method, the adding manner of an early strength agent is changed, the early concrete strength under the low temperature condition is improved, and no bad influence is generated on the later strength and other physical and mechanical properties.

Description

technical field [0001] The invention belongs to the technical field of concrete construction, and in particular relates to a method for early strength cracking and freezing prevention of concrete floor slabs in winter construction. Background technique [0002] For the floor pouring of reinforced concrete buildings, especially in the winter when the temperature is low, the strength of the floor concrete increases slowly. Due to various reasons, the cracking of the concrete floor is more prominent, which is a major problem in construction. In order to improve the early stage of concrete Strength, usually by adding accelerators to concrete, but after adding accelerators, the slump loss of concrete is faster. If the transportation distance is long and some unforeseen factors are added, stagnation often occurs. If the time is too long, some stay for as long as four or five hours or even longer. In this case, because the concrete slump is too small, inappropriate methods such as...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/02E04G21/24
CPCE04G21/02E04G21/246
Inventor 王晓芳叶铭勋鹿立云盛思仲黄雪
Owner 南京友西科技集团股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products