A method for early strength, anti-cracking and anti-freezing of concrete floor slabs in winter construction
A concrete and floor slab technology, applied in the processing of building materials, construction, building structure, etc., can solve the problems of long residence time, rapid loss of concrete slump, increase of concrete, etc., to meet the fluidity requirements, avoid Floor cracks, the effect of improving early strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] A multi-storey commercial and residential building, the floor area of each floor is 987.9m 2 , book C30 commercial concrete 250m 3 , the temperature at that time was 5-10°C, the concrete transportation distance was 17km, the traffic along the way was heavy, and it took 40-80 minutes from the concrete mixing station to the construction site.
[0026] The method for early strength anti-crack and anti-freezing of the concrete floor slab winter construction of the present embodiment is carried out according to the following steps:
[0027] (1) Sodium sulfate early-strength agent has been added to the commercial concrete, and the amount of sodium sulfate equivalent to 0.3% of the weight of cement in the concrete belongs to low dosage;
[0028] (2) After the concrete floor slab is poured, bricks shall be laid around to retain water, and a 15m 3 One water tank is used to prepare a curing aqueous solution with a weight concentration of 3% sodium sulfate. After the floor con...
Embodiment 2
[0030] A three-story factory building, the floor area of each floor is 2130m 2 , booked C35 ordinary pumping commercial concrete 640m 3 , the transportation distance is 25km, and it takes about 60-80 minutes. At that time, the temperature is 4-8°C, and no early strength agent is used in the concrete batching;
[0031] After the concrete pouring is completed, lay bricks around the floor to retain water, and prepare a 15m 3 One water tank, prepare a curing aqueous solution with a mass concentration of 0.05% triethanolamine as the curing water for the floor concrete, store the water at a height of 1-1.2 cm, keep it for 7 days, and use tap water for later maintenance.
Embodiment 3
[0033] A high-rise commercial and residential building, the floor area of each floor is 1500m 2 , ordered 350m 3 Pumping concrete, the temperature at that time was 3-7°C, and the concrete transportation distance was 26km. Since the construction was located in the city center, the traffic jam was serious. It took more than 1.5 hours from the mixing station to the construction site. No early strength agent was added to the concrete. When pouring concrete for the floor slab, use 3cm thick wooden boards to surround it to block water, and the construction site has 15m 3 One water tank is used to prepare a mixed solution of 0.02% triethanolamine and 3% sodium sulfate by weight as the curing water for floor concrete.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com