A construction method and technology for curved roads, applied in the directions of tracks, roads, ballast layers, etc., can solve the problems of reduced vegetation, reduced design utility and reduced design utility of superelevated outer rails of curved tracks, etc., so as to improve soil firmness. , Improve the fixing effect and reduce the effect of the settling velocity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Embodiment 1: a kind of railway curved track, such as figure 1 , 2As shown, it includes an arc-shaped ballast bed 1, a fixed sleeper 2 inclined towards the arc center of the ballast bed 1, and a plurality of fixed sleepers 2 are arranged in sequence along the extending direction of the ballast bed 1, and the fixed sleeper 2 is provided with buckles 21, the rail 3 is fixed on the fixed sleeper 2 through the fastener 21, and the rail 3 is effectively fixed on the sleeper. Since the fixed sleeper 2 is close to the arc center of the arc-shaped ballast bed 1, the position of the arc center is inclined downward, so that after the rail 3 is fixed, The height of the outer rail is slightly higher than the height of the inner rail, forming a super-high design of the outer rail of the arc track. When the train passes by, the wheels are offset to the outer rail. Since the outer rail is slightly higher, it produces a reaction force against the centrifugal force. Thereby effectively...
Embodiment 2
[0044] Embodiment 2: a kind of construction method of railway curved track,
[0045] Step 1: Subgrade forming: Excavating an arc-shaped railway subgrade with a concave bottom surface of at least 0.2 meters on the bottom surface by an excavating machine, and compacting the railway subgrade by a road roller;
[0046] Step 2: Excavating the fixed ditch: Excavate the fixed ditch by excavating machinery at a position at least 0.5 meters away from the arc center of the railway embankment;
[0047] Step 3: forming and installing the vertical support plate: the vertical support plate 6 is formed by directly pouring cement into the fixed ditch, or the prefabricated vertical support plate 6 is put into the fixed ditch for installation;
[0048] Step 4: Support column installation: Make limit holes to the vertical support plate 6 on the side of the railway subgrade close to the vertical support plate 6. The inclination angle of the limit holes is at least 30 degrees, and then insert the ...
Embodiment 3
[0056] Embodiment 3: a kind of construction method of railway curved track,
[0057] Step 1: Subgrade forming: Excavating an arc-shaped railway subgrade with a concave bottom surface of at least 0.2 meters on the bottom surface by an excavating machine, and compacting the railway subgrade by a road roller;
[0058] Step 2: Excavating the fixed ditch: Excavate the fixed ditch by excavating machinery at a position at least 0.5 meters away from the arc center of the railway embankment;
[0059] Step 3: forming and installing the vertical support plate: the vertical support plate 6 is formed by directly pouring cement into the fixed ditch, or the prefabricated vertical support plate 6 is put into the fixed ditch for installation;
[0060] Step 4: Support column installation: Make limit holes to the vertical support plate 6 on the side of the railway subgrade close to the vertical support plate 6. The inclination angle of the limit holes is at least 30 degrees, and then insert the ...