Unlock instant, AI-driven research and patent intelligence for your innovation.

A kind of installation method of sling tower

An installation method and a technology for slinging towers, which are applied in erecting/assembling bridges, buildings, bridge construction, etc., can solve the problems of long construction period of the main structure, long construction period of the bridge, and great difficulty in construction, so as to shorten the construction period, Simple construction and improved accuracy

Active Publication Date: 2019-03-22
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the above-mentioned construction process, since the tower is assembled in vertical segments, a large tower crane is required, which makes the construction difficult; and because the installation of the tower with slings needs to rely on the side-span steel arch ribs and mid-span steel arch ribs on both sides. For the arch rib, the sling tower can only be assembled after the construction of the side-span steel arch rib and mid-span steel arch rib is completed. Therefore, installing the sling tower in this way takes a long construction period of the main structure, which makes the construction period of the bridge long and the cost is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of installation method of sling tower
  • A kind of installation method of sling tower

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

[0023] see figure 1 and figure 2 As shown, the embodiment of the present invention provides a method for installing a sling tower, including the following steps:

[0024] S1: After the construction of the side-span steel arch rib 1 is completed, the sling tower 2 is assembled section by section along the longitudinal bridge direction on the side-span steel arch rib 1, and the middle-span steel arch rib 4 is installed, and the side-span steel arch rib 1 Install the base 3 at a position close to the mid-span steel arch rib 4, and hinge one end of the sling tower 2 to the base 3;

[0025] S2: After the sling tower 2 is assembled, the front sling 5 extending to the mid-span steel arch rib 4 and the rear sling 6 extending to the side-span steel arch rib 1 are installed on the other end of the sling tower 2, The cable crane lifts the sling tower...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for installing a cable tower and relates to the field of bridge construction. The method includes the steps that 1, after sidespan steel arch rib construction is completed, the cable tower is assembled section by section on a sidespan steel arch rib in the longitudinal direction of a bridge, a midspan steel arch rib is installed, a base is installed in the position, close to the midspan steel arch rib, of the sidespan steel arch rib, and one end of the cable tower is connected with the base; 2, after the cable tower assembly is completed, a front hoist cable and a rear hoist cable are installed at the other end of the cable tower, wherein the front hoist cable extends toward the midspan steel arch rib and the rear hoist cable extends toward the sidespan steel arch rib, and a cable lifting machine lifts the cable tower and makes the cable tower rotate to a vertical state; 3, the front hoist cable and the rear hoist are stretched, the front hoist cable is connected with the midspan steel arch rib, the rear hoist cable is connected with the sidespan steel arch rib, and the installation of the cable tower is completed. According to the method for installing the cable tower, the construction is simple, the installation is convenient, and the cost is saved.

Description

technical field [0001] The invention relates to the field of bridge construction, in particular to a method for installing a suspension tower. Background technique [0002] Suspension towers play a pivotal role in the cantilever construction of steel truss arch bridges and steel truss girders. The steel arch rib and the steel beam node of the mid-span steel arch rib are assembled vertically and segmentally into the suspension tower, and temporary wind cables are set on both sides of the tower during the assembly process to connect the side-span steel arch rib The mid-span and mid-span steel arch ribs are all connected to the tower to enhance the stability and wind resistance of the sling tower during assembly. [0003] In the above-mentioned construction process, since the tower is assembled in vertical segments, a large tower crane is required, which makes the construction difficult; and because the installation of the tower with slings needs to rely on the side-span steel...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/10
CPCE01D21/10
Inventor 邓玉平洪立陈治任潘东发吴方明宋小三涂满明毛伟琦田继开周超舟刘玲晶聂井华刘生奇王武力刘志燕陈凤金
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD