Construction method of hoisting rods for large-span ball-jointed spherical network frame group
A ball joint, long-span technology, applied in the processing of building materials, construction, building construction, etc., can solve the problems of grid deformation, high mechanical costs, and many hidden dangers
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] The construction method of large-span ball-node spherical grid group pulling rod hoisting includes the following steps: making small units and spreading and assembling them around, the first stage of lifting, outward assembly of spherical grids, installation of pulling rod clusters, and the second stage of lifting , the outward assembly of the spherical grid and the fixation of the spherical grid; among them, the first stage of lifting uses a tripod to lift the spherical grid, and the lifting height meets the installation height of the next row of lower chords and ball joints; pull out the cluster The installation includes leveling and compacting the site, making the steel pipe into a pulling rod, positioning the pulling rod, positioning and excavating the cable wind rope anchor pit, laying the cable wind ground anchor, correcting the pulling rod assembly, adjusting and tensioning the cable wind rope, and pulling the rod pulley block Installation and hoisting winch insta...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 