Method for preventing oil-string casing of oil-water well from moving upward
A technology for oil-water wells and surface casings, which is applied in the field of oil-water well production. It can solve problems such as repeated welding between reinforcement tools and oil layer casings, damage to the oil layer casing body, and time-consuming and labor-intensive problems. , Operational safety effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0042] This embodiment provides a method for controlling the upward channeling of the reservoir casing in the Z61-6X well, and the specific steps are as follows:
[0043] Step 1: Pretreatment of reservoir casing
[0044] Pull out the production string in the oil well, set the predetermined position of the packer in the sealing string to 5m from the top of the oil layer casing, run the scraping string in the downhole casing, in the scraping string, the first tubing, tubing The variable buckle joint and the GX-T140 casing scraper are threaded sequentially from top to bottom. The casing scraper is driven by the first oil pipe to move up and down in the casing of the oil layer, scraping the inner wall of the casing 10m below the wellhead once, and repeatedly scraping the 5m up and down of the sealing well section 3 times to remove scale and dirt on the inner wall of the downhole casing Wax and other casing wall obstructions. After the scraping is completed, take out the scraping...
Embodiment 2
[0063]This embodiment provides a method for controlling the upward channeling of the oil layer casing in the J45-210 well, and the specific steps are as follows:
[0064] Step 1: Pretreatment of reservoir casing
[0065] Pull out the production string in the oil well, set the predetermined position of the sealing string packer at 5m from the top of the oil layer casing, and run the scraping string into the downhole casing. The joint and GX-T140 casing scraper are threaded sequentially from top to bottom. The casing scraper is driven by the first oil pipe to move up and down in the casing of the oil layer, scraping the inner wall of the casing 10m below the wellhead once, and repeatedly scraping the 5m up and down of the sealing well section 3 times to remove scale and dirt on the inner wall of the downhole casing Wax and other casing wall obstructions. After the scraping is completed, take out the scraping string.
[0066] Step 2: Pre-treatment of oil and water wells
[00...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com