Data time domain transmission method, control method, terminal, base station and baseband chip
A technology of data transmission and time domain transmission, which is applied in the field of communication, and can solve problems that affect communication functions, are not always available, and fail to transmit data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] figure 1 A flow chart of a data time-domain transmission method according to an embodiment of the present invention is shown.
[0062] like figure 1 As shown, the data time domain transmission method of an embodiment of the present invention is used to transmit data in an unlicensed frequency band, including:
[0063] Step 102, within the current channel occupancy time, obtain the continuing transmission scheduling information issued by the base station.
[0064] The continuation scheduling information is the information indicating when and how the terminal performs repeated data continuation within the current channel occupation time, and the data continuation refers to the terminal uploading data to the base station and / or the base station sending data to the base station. The terminal sends data, and of course, data continuation can also be data interaction between two terminals.
[0065] Therefore, in the process of data transmission through the physical uplink s...
Embodiment 2
[0070] figure 2 A flow chart of a data time-domain transmission method according to another embodiment of the present invention is shown.
[0071] like figure 2 As shown, the data time domain transmission method of another embodiment of the present invention is used to transmit data in an unlicensed frequency band, including:
[0072] Step 202, detecting the start time point of the current channel occupation time at the base station side. That is, the time point at which the base station starts to occupy the current channel is acquired.
[0073] Step 204, detecting the interval between the time point at which data transmission stops in the previous channel occupation time and the start time point of the current channel occupation time.
[0074]Wherein, the time point at which data transmission stops can be any point within the previous channel occupation time, and can also be at the end time point of the previous channel occupation time. In this way, it can be accurately ...
Embodiment 3
[0103] exist figure 2 On the basis of the illustrated embodiment, the step of determining the first time point within the current channel occupancy time according to the continued transmission scheduling information may also be combined with Figure 5 and Image 6 Another implementation is shown.
[0104] like Figure 5 shown, including:
[0105] Step 502, determining a second time point at which the terminal detects the retransmission scheduling information, and a time interval between the second time point and the first time point.
[0106] Step 504: Add the second time point to the time interval to obtain the first time point. The time interval refers to the time interval required for data continuation after the second time point, that is,
[0107]
[0108] in, is the second time point when the terminal detects the continued transmission scheduling information, k is the time interval between the second time point and the first time point, k≥0, is the first time...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com