Method for adjusting tension of balance steel wire ropes of LNG storage tank dome

A technology for balancing steel wire ropes and adjusting force, which is applied in the field of adjusting the tension force of steel wire ropes for domes of LNG storage tanks, can solve the problems of poor adjustment accuracy, high construction cost, construction difficulties, etc. Effect

Active Publication Date: 2017-07-18
CHINA NUCLEAR IND FIFTH CONSTR CO LTD
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the problems of high construction cost, difficult construction and poor adjustment accuracy when adjusting the pulling force of the dome balance wire rope of the LNG storage tank using the prior art, the present invention proposes a brand-new method for adjusting the tension of the dome balance wire rope of the LNG storage tank method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for adjusting tension of balance steel wire ropes of LNG storage tank dome
  • Method for adjusting tension of balance steel wire ropes of LNG storage tank dome
  • Method for adjusting tension of balance steel wire ropes of LNG storage tank dome

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The technical solutions in the present invention will be described in detail below in conjunction with the accompanying drawings.

[0032] to combine figure 2 As shown, adopt the method for adjusting the dome of the LNG storage tank to balance the tension of the steel wire rope of the present invention, the concrete steps are as follows:

[0033] Step one, install the balance wire rope.

[0034] to combine image 3As shown, the outer surface of the dome 3 is provided with a pulley assembly, and the pulley assembly includes a central pulley 91 , two guide rollers 92 and a pulley 93 . Wherein, center pulley 91 is positioned at the center hole position of dome 3, and tackle 93 is positioned at the edge position of dome 3, and two guide rollers 92 are positioned at the middle position of center pulley 91 and tackle 93, and center pulley 91, two guide rollers 92 and tackle 93 are arranged along the same arc on the outer surface of the dome 3 . One end of the balance wir...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of construction of LNG storage tanks, particularly relates to a method for adjusting tension of balance steel wire ropes of an LNG storage tank dome, and aims to solve the problems that when the prior art is adopted to adjust tension of the balance steel wire ropes of the LNG storage tank dome, construction cost is high, construction is difficult and adjustment precision is poor. The novel method for adjusting tension of the balance steel wire ropes of the LNG storage tank dome comprises the step I of mounting the balance steel wire ropes, the step II of establishing a model and confirming the relationship between adjustment force and deformation amount of the balance steel wire ropes, and the step III of adjusting tension of the balance steel wire ropes. When the method is adopted to adjust tension of the balance steel wire ropes of the LNG storage tank dome, construction cost is reduced, tension of all the balance steel wire ropes can be quickly adjusted, all the balance steel wire ropes meet the requirement of tensile force values, and stability and safety of the air jacking process of the dome are guaranteed.

Description

technical field [0001] The invention belongs to the field of LNG storage tank construction, and in particular relates to a method for adjusting the dome of an LNG storage tank to balance the pulling force of a steel wire rope. Background technique [0002] The installation of the dome of the LNG storage tank generally adopts the gas jacking method. In the process of gas lift, in order to ensure that the dome can keep moving upwards horizontally without overturning, a balance device must be provided for the dome. At present, the balanced fixing of the dome is realized by arranging multiple sets of symmetrical balance steel wire ropes along the circumferential direction of the storage tank. to combine figure 1 As shown, one end of the balance wire rope 1 is fixedly connected to the edge of the tank bottom 2, and the other end is fixed on the top of the tank wall 5 on the opposite side after passing around the guide roller 41 on the same side and the guide roller 42 on the op...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B23P19/10G06F17/50
CPCB23P19/10F17C2209/22G06F30/20
Inventor 胡胜详徐树凯罗仁廖佰坤杨小兵汪涛王当当姜波郑欣悦
Owner CHINA NUCLEAR IND FIFTH CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products