Tube section joint fire-protection structure for immersed tube tunnel and construction method
A technology of immersed tunnel and construction method, which is applied in basic structure engineering, artificial island, water conservancy engineering and other directions, can solve the problems of fire prevention failure and inability to adapt to the fireproof board, so as to prevent impact damage, improve stability, and improve efficiency. Effects of Sex and Reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as figure 1 , 2 . As shown in 3, a fireproof structure for pipe joint joints used in immersed tunnels, including:
[0041] The first protective part 1, the first protective part 1 is a rigid structural part, one end of which is used to be fixed on the end side of the pipe joint 01, and the other end is used to be flexibly connected to the end side of the pipe joint 2 02;
[0042] The second protective piece 2, the second protective piece 2 is a flexible structural member, one end of which is used to be fixed on one side of the end of the pipe joint 1 01, and the other end is used to be fixed on the end of the pipe joint 2 02 side.
[0043]Wherein the above-mentioned second protective part 2 is located in the joint inner chamber 03 surrounded by the first protective part 1 and the first pipe joint 01 and the second pipe joint 02. When an explosion impact occurs in the driving hole 04 of the pipe joint, the rigid first The protective piece 1 protects the flexible ...
Embodiment 2
[0051] Such as Figure 1-3 As shown, the present invention also provides a construction method for the above-mentioned fireproof structure of the pipe joint, comprising the following steps;
[0052] Step 1. Install the second protective piece 2, and connect the second protective piece 2 between the end of the first pipe joint 01 and the second pipe joint 02 after the butt joint is completed, that is, fix one end of the second protective piece 2 on the pipe joint On the end of 101, fix the other end on the end of pipe joint 202;
[0053] Step 2. Install the first protective piece 1. After fixing one end of the first protective piece 1 to the end of the pipe joint 101 through the bolt 6, connect the other end to the pipe joint 2, so that the first protective piece 1 The other end can slide relative to the end surface of pipe joint 202.
[0054] In the above step 2, before installing the first protective piece 1, connect the support piece 3 between the end of pipe joint 1 01 an...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com