Prefabricated pile cap foundation, power transmission tower and construction method for power transmission tower
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUANGZHOU ELECTRIC POWER DESIGN INST
- Publication Date
- 2017-08-25
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of electric power facility construction, in particular to a prefabricated cap foundation, a power transmission tower and a construction method thereof. Background technique
[0002] Traditionally, the concrete foundation construction of transmission lines and substations is an important part of power engineering construction. Now the foundation forms that are widely used are reinforced concrete independent foundations or pile foundations. There are many disadvantages in the operation process of the cast-in-place foundation form: 1) The construction period is long. A series of construction steps such as foundation excavation, foundation fabrication, concrete maintenance, and foundation demolition all take a long time, and the maintenance cycle alone generally takes about 28 days; 2) The construction cost is high. The construction links such as excavation of foundation pit, rental of machinery, mold manufactu...