Method for mining thick ore body through segmental ore breaking and subsequent cemented filling
A technology of cemented filling, thick and large ore body, applied in the direction of filling, ground mining, mining equipment, etc., can solve the problems of high investment, complicated process, low ore output, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] This mining method is applied to the poor ore in the eastern part of the No. 2 mining area of Jinchuan.
[0032] A mining method for segmental collapse followed by cementation and filling for thick and large ore bodies, comprising the following steps:
[0033] 1) Divide the ore body into several segments in the vertical direction of the ore body, and the segment height is 20m;
[0034] 2) In each segment of step 1), divide the ore body into several stopes at intervals of 10m along the ore body, and the width and length of the stope are both 10m;
[0035] 3) In each stope of step 2), a rock drilling roadway 1 is arranged perpendicular to the ore body, and the rock drilling roadway passes through the ore body to the surrounding rock of the ore body hanging wall. The size of the rock drilling roadway 1 is 4m in width and 4m in height;
[0036] 4) Support the rock drilling roadway in step 3) according to the following steps:
[0037] a. Spray 50mm thick concrete on the ...
Embodiment 2
[0045] This mining method is applied to a lean ore in the No. 2 mining area of Jinchuan.
[0046] A mining method for segmental collapse followed by cementation and filling for thick and large ore bodies, comprising the following steps:
[0047] 1) Divide the ore body into several segments in the vertical direction of the ore body, and the segment height is 25m;
[0048] 2) In each section of step 1), divide the ore body into several stopes at intervals of 12.5m along the direction of the ore body, and the width and length of the stope are both 12.5m;
[0049] 3) In each stope of step 2), a rock drilling roadway is arranged vertically to the ore body, and the rock drilling roadway passes through the ore body to the surrounding rock on the ore body wall. The size of the rock drilling roadway is 4m wide and 4m high;
[0050] 4) Support the rock drilling roadway in step 3) according to the following steps:
[0051] a. Spray 100mm thick concrete on the roadway wall;
[0052] ...
PUM
Property | Measurement | Unit |
---|---|---|
strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com