A preparation process for ultra-thin prefabricated thermal insulation exterior wall panels for building industrialization
A thermal insulation exterior wall and preparation technology, which is applied to buildings, building components, building structures, etc., can solve the problems of strict molding conditions, increased material costs, and unsuitability for general use, etc., to achieve enhanced stability and extended service life , the effect of increasing strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A preparation process for ultra-thin prefabricated thermal insulation exterior wall panels for building industrialization, the preparation steps are as follows:
[0030] 1) Put the configured concrete material in the inner mold and pour and tamp it to obtain the prefabricated inner layer plate. The inner mold is a "concave" structure, and the lower concave part of the inner mold is provided with several boss structures, and the height of the boss is the same as The concave depth of the inner mold is the same;
[0031] 2) Place the configured concrete material in the outer mold and pour and pound it to obtain the prefabricated outer layer plate. The outer mold is also a "concave" shape structure, and the lower concave part of the outer mold is also provided with several boss structures, and the bosses The height is less than the concave depth of the outer mold;
[0032] 3) Pour and tamp reinforcing materials to the outer layer plate corresponding to the boss structure, ...
Embodiment 2
[0038] A preparation process for ultra-thin prefabricated thermal insulation exterior wall panels for building industrialization, the preparation steps are as follows:
[0039] 1) Put the configured concrete material in the inner mold and pour and tamp it to obtain the prefabricated inner layer plate. The inner mold is a "concave" structure, and the lower concave part of the inner mold is provided with several boss structures, and the height of the boss is the same as The concave depth of the inner mold is the same;
[0040] 2) Place the configured concrete material in the outer mold and pour and pound it to obtain the prefabricated outer layer plate. The outer mold is also a "concave" shape structure, and the lower concave part of the outer mold is also provided with several boss structures, and the bosses The height is less than the concave depth of the outer mold;
[0041] 3) Pour and tamp reinforcing materials to the outer layer plate corresponding to the boss structure, ...
Embodiment 3
[0047] A preparation process for ultra-thin prefabricated thermal insulation exterior wall panels for building industrialization, the preparation steps are as follows:
[0048] 1) Put the configured concrete material in the inner mold and pour and tamp it to obtain the prefabricated inner layer plate. The inner mold is a "concave" structure, and the lower concave part of the inner mold is provided with several boss structures, and the height of the boss is the same as The concave depth of the inner mold is the same;
[0049] 2) Place the configured concrete material in the outer mold and pour and pound it to obtain the prefabricated outer layer plate. The outer mold is also a "concave" shape structure, and the lower concave part of the outer mold is also provided with several boss structures, and the bosses The height is less than the concave depth of the outer mold;
[0050] 3) Pour and tamp reinforcing materials to the outer layer plate corresponding to the boss structure, ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| compressive strength | aaaaa | aaaaa |
| flexural strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 