Urban overlapped tunnel excavating construction method under shallow-buried condition

A technology of tunnel excavation and construction methods, which is applied in tunnels, tunnel linings, underground chambers, etc., to achieve the effects of strong operability, advanced technology, and high promotion and application value.

Active Publication Date: 2017-11-07
中铁十一局集团第五工程有限公司 +1
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The superimposed form of building road tunnels and power tunnels under the condition of shallow urban burial is currently the first

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Urban overlapped tunnel excavating construction method under shallow-buried condition
  • Urban overlapped tunnel excavating construction method under shallow-buried condition
  • Urban overlapped tunnel excavating construction method under shallow-buried condition

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:

[0027] A superimposed tunnel excavation construction method under the condition of urban shallow burial, such as figure 1 As shown, the construction is carried out in the following steps:

[0028] In the first step, the excavation of the upper main tunnel (such as a highway tunnel) is carried out using the CRD method. Excavation, and corresponding initial support and temporary support after excavation of each pilot pit. There are at least two pilot pits from top to bottom on the left and right sides of the upper main tunnel.

[0029] (1) Horizontal drilling and coring of the upper pilot pit + breaker crushing: the upper pilot pit of the upper main tunnel is drilled horizontally along the contour line of the upper pilot pit with a drilling machine, and then the broken hammer is used to break the core in the upper pilot pit The rock mass provides enough ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an urban overlapped tunnel excavating construction method under a shallow-buried condition, and relates to the technical field of tunnel construction methods. Excavating of an upper layer main tunnel is constructed by adopting a CRD method, the left side and the right side of the upper layer main tunnel are sequentially divided into at least two pilot tunnels from top to bottom, excavating is sequentially conducted from top to bottom at each side, and essential primary bracing and temporary bracing are conducted; the left side and the right side of the upper layer main tunnel are constructed one after another, excavating for the upper pilot tunnel of each side is conducted by adopting modes of hole drilling machine horizontal drilling and core-taking and quartering hammer crushing, and excavating for the rest of the pilot tunnels is conducted in a static blasting mode; the upper layer main tunnel is excavated first, and then a lower layer tunnel is excavated, and excavating for the lower layer tunnel is conducted by adopting modes of mechanical cutting and quartering hammer crushing. The urban overlapped tunnel excavating construction method under the shallow-buried condition is applicable to the shallow-buried tunnels without disadvantageous geology conditions (faults, crushed zones and the like) with the buried depth being not less than 5 meters and the area of the excavated section being not greater than 150 square meters, the requirement for surrounding environment is high, vibration-free protective construction is required, and the construction process is fast.

Description

technical field [0001] The invention relates to a tunnel construction method, in particular to an excavation construction method for superimposed tunnels under the condition of shallow urban burial. Background technique [0002] At present, in the construction of highway tunnels, affected by the overall urban planning and operating routes, it is inevitable to pass under dense ground buildings (structures). It is not only necessary to ensure the safety of the tunnel project itself, but also to properly solve the Impact on nearby existing buildings. [0003] The superimposed form of building road tunnels and power tunnels under the condition of shallow urban burial is still the first. The road tunnel is the upper main tunnel, and the power tunnel is the lower tunnel. The power tunnel is located directly below the road tunnel. Due to the dense and old surface structures on the upper part of the superimposed tunnel, it is required during the construction process: no disturbance...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/14E21D9/10E21D11/18E21D11/10
CPCE21D9/10E21D9/1053E21D9/14E21D11/10E21D11/18
Inventor 李彦玮陈龙章献李果赵友超王元清李勇
Owner 中铁十一局集团第五工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products