A self-anchored suspension bridge and construction method technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the difficulty of ensuring the alignment of the steel box girder in the closing section, the large influence of the temperature deformation of the closing mouth, and the large investment in construction equipment, etc. To solve the problem, to achieve the effect of simple and clear support force, reduce construction cost and reduce construction difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] A construction method for closing steel box girders of a self-anchored suspension bridge, comprising the following steps:
[0025] S1: The standard section 3 of the steel box girder is constructed by the jacking method, and the steel guide beam 2 is pushed to the front end of the steel anchor beam assembly support 1.
[0026] S2: The steel anchor beam 4 is tailor-welded on the steel anchor beam assembly bracket 1, and a reserved steel anchor beam segment 5 connecting the steel anchor beam 4 and the steel box girder standard section 3 is not assembled, and is used as the steel guide beam 2 demolition space. Steel anchor beam assembling support 1 is provided with assembling tire frame 6, and assembling tire frame 6 can adjust steel anchor beam 4 assembling linearity and precision. The steel anchor beam 4 can be tailor-welded on the steel anchor beam assembly support 1 during the pushing of the steel box girder standard section 3, so as to save the construction period.
...