Construction method of a cast-in-place decorative hanging board structure under beams
A construction method and technology for decorating hanging panels, which are applied in the field of architectural decoration engineering, can solve the problems of complicated positioning of steel bars for hanging panels, difficult template positioning, and difficulty in ensuring the connection strength between the hanging panels and upper beams, etc. The effect of construction difficulty and on-site installation convenience
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] Formwork fabrication and construction technical requirements, on-site welding construction technical requirements, concrete pouring construction technical requirements, bolt connection construction technical requirements and other technical requirements in this embodiment will not be described in detail in this embodiment, and the embodiments of the present invention related to construction methods will be focused on.
[0049] figure 1 It is a schematic diagram of the integrated construction structure of the hanging board and the upper beam of the present invention, figure 2 It is a schematic diagram of the staged construction structure of the hanging board and the upper beam of the present invention, image 3 yes figure 1 , figure 2 A schematic plan view of the bottom mold pallet, Figure 4 yes figure 1 , figure 2 Profile diagram of the steel limiter, Figure 5 yes figure 1 , figure 2 Top view of the inner mold limit plate.
[0050] refer to Figure 1 to ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


