Final joint transporting base and construction method
A construction method and sleeper technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as difficult construction, concrete cracking, and long construction period, and achieve the goal of simplifying construction technology, ensuring stability, and avoiding sliding Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] All features disclosed in this specification, or steps in all methods or processes disclosed, may be combined in any manner, except for mutually exclusive features and / or steps.
[0033] Any feature disclosed in this specification, unless specifically stated, can be replaced by other alternative features that are equivalent or have similar purposes. That is, unless expressly stated otherwise, each feature is one example only of a series of equivalent or similar features.
[0034] Such as figure 1 , figure 2 and image 3As shown, a final joint transportation base of the present invention includes a concrete layer 1 arranged on the barge deck and a sleeper layer immediately above it, and the concrete layer 1 is arranged symmetrically with respect to the center line of the barge deck in the width and length directions, The sleeper layer is composed of a number of sleepers laid adjacent to each other, and the barge deck is provided with a number of stop frames in contac...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com