Embodiment 1
[0058] This example is based on the positioning method of the inclined plate in the filling condition of anti-slide piles, including the following steps:
[0059] (1) Production of model boards
[0060] Such as figure 1 As shown, make a model plate 6 with the same size as the cross-section of the inclined board, the cross-section of the model plate is a pentagon including three right-angled sides, including two rows of positioning holes 7, the distance between each row is the same and each row of holes It is the same as the distance between the holes, including the first obtuse angle 1 , the second obtuse angle 2 , the first right angle 3 , the second right angle 4 and the third right angle 5 .
[0061] In this example, 15 pieces are set in the model board rebar.
[0062] For the filling condition, the model board is made of 30mm thick wood board. The cross-sectional size of the model board is the same as that of the inclined board, and the position of the hole is the posi...
Embodiment 2
[0098] Using the method of Example 1, the anti-sliding piles on Xiubei Road in the central area of Haidong Mountain New City in Dali are positioned with inclined inserting plates.
[0099] Xiubei Road, the central area of Dali Haidong Mountain New City, is located in the Haidong Mountain City Development Area at a distance of about 11km in the direction of 39° in Dali City. . Xiubei Road is a newly planned municipal road, which belongs to the urban secondary trunk road, and the road grade is second-class. The proposed road is divided into Section A and Section B; Section A starts at BK0+042.686 of Section B and ends at Tianxiu Road and Biqiao Road intersection; section B starts from Tianxiu Road (about 500 meters east of the intersection of Aimin Road and Tianxiu Road), and ends at section A AK0+627.076; section A is 724.825 meters long, and section B is 898.460 meters long.
[0100] The longitudinal topography of Line B has large undulations, and the horizontal slope of ...