Connection method for ultrahigh-rise core tube beam and vertical structure

A technology of vertical structure and connection method, applied in special structures, building components, building structures, etc., can solve the problems of beam steel bar offset, steel bar connection, time-consuming and labor-intensive, etc., achieve accurate beam steel bar position, reduce construction strength, Guarantee the effect of construction quality

Inactive Publication Date: 2018-02-23
NO 4 ENG CO LTD OF CCCC FIRST HARBOR ENG CO LTD +1
View PDF1 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the staggered construction of the vertical structure and the horizontal structure of the core tube, and the climbing formwork system is often used in the core tube, it is bound to cause the connection problem of the horizontal structure and the vertical core tube structure reinforcement
One of the traditional pre-embedding methods of beam reinforcement is to directly pre-embed the beam reinforcement in the relevant parts. This method will make it difficult to dig in the later stage, time-consuming and labor-intensive, and it is easy to cause the deviation of the beam reinforcement during the concrete pouring process, resulting in the horizontal structure construction in the later stage. It is difficult to connect steel bars; another construction method is to reserve the wall according to the anchorage length of steel bars required by the code. Usually, the pre-embedded steel bars are bent and embedded in the protective layer of the steel bars
The filling material used for the protective layer is polystyrene foam board. This method is well suited to the characteristics of climbing formwork construction, but it is still easy to cause the deviation of the steel bars during the concrete pouring process, especially for the steel bars of the beams, resulting in the reinforcement of the later beam construction. difficult to connect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Connection method for ultrahigh-rise core tube beam and vertical structure
  • Connection method for ultrahigh-rise core tube beam and vertical structure
  • Connection method for ultrahigh-rise core tube beam and vertical structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be further described below in conjunction with embodiment:

[0023] A method for connecting a super high-rise core tube beam to a vertical structure, comprising the following steps:

[0024] a. First, the climbing formwork 7 system is used to construct the core tube shear wall structure. In the concrete vertical structure 1, pre-embedded anchor bars 3, pre-embedded steel plates 4 and several pre-embedded threaded sleeves 6 are arranged in sequence from left to right. The embedded steel plate 4 adopts a 4mm thick steel plate, the embedded steel plate 4 is connected with the anchoring steel bar 3 of the embedded part through perforated spot welding, and the embedded threaded sleeve 6 is a straight threaded steel bar sleeve;

[0025] b. The left and right end surfaces of the pre-embedded threaded sleeve 6 are respectively the inner end and the exposed end. The screw holes at the exposed end of the pre-embedded threaded sleeve 6 are filled with co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a connection method for an ultrahigh-rise core tube beam and a vertical structure. The connection method comprises the following steps: firstly, constructing a core tube shearwall structure by adopting a climbing form system; respectively setting the left and right end surfaces of embedded threaded sleeves as internal connection ends and external exposure ends; enabling the internal connection ends of the embedded threaded sleeves to all penetrate through embedded steel plates and be connected with embedded part anchoring steel bars; and after the wall is formed by pouring and reaches specified strength, constructing beam steel bars; installing the beam steel bars. According to the connection method, by cooperative use of the embedded part anchoring steel bars, theembedded steel plates and the embedded threaded sleeves, positions of the beam steel bars in a concrete pouring process can be kept unchanged, convenience is provided for connection of the beam steelbars in the later stage, and accurate positions of the beam steel bars are guaranteed; furthermore, the construction quality can be well guaranteed; and to construct a horizontal beam structure of acore tube of an ultrahigh-rise building, polystyrene boards are directly removed, and no chiseling for a concrete structure is needed, so that the construction intensity is reduced, and straight and smooth lines at concrete joints of the horizontal beam structure and the vertical structure are guaranteed.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a method for connecting a super high-rise core tube beam and a vertical structure. Background technique [0002] With the rapid development of the national economy, my country's construction industry has produced unprecedented innovation and vitality, resulting in more and more super high-rise buildings, and many super high-rise buildings adopt the form of steel structure frame and concrete core tube structure. In conventional construction applications, the core tube and the outer frame of this structural form are constructed in a three-dimensional intersection, and the vertical structure of the core tube is firstly constructed, and then the horizontal structure is constructed. Due to the staggered construction of the vertical structure and the horizontal structure of the core tube, and the climbing formwork system is often used in the core tube, it is bound to caus...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/34E04B1/41
CPCE04B1/3404E04B1/4157
Inventor 李威李晓冬张保卫王滨
Owner NO 4 ENG CO LTD OF CCCC FIRST HARBOR ENG CO LTD