High slope presplitting blasting construction method

A pre-splitting blasting and slope technology, which is applied in the field of high slope pre-splitting blasting construction methods, can solve the problems of inconvenient slope measurement, difficulty in ensuring slope stability, and large slope impact, so as to avoid two The effect of secondary slope treatment, convenient measurement, and prevention of landslides

Active Publication Date: 2021-09-03
包头市公路工程股份有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The blasting construction process involves a lot of content, among which blasting excavation with multiple steps on high slopes is a difficult point in engineering construction, especially in special environments such as complex terrain of the excavation line and large surface undulations, the traditional processing method is in On the edge of the pre-splitting design, the drilling angle is preliminarily estimated using the drilling rig inclination method, and the accuracy is poor. Overbreak and undercut are obvious in the blasting treatment area, and post-processing is difficult. After that, the stability of the slope is difficult to guarantee; and after the blasting, the traditional slope measurement device cannot be used to measure the slope conveniently, and when measuring, the vertical angle and horizontal angle of the slope need to be measured twice separately, which has the advantages of certain inconvenience

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High slope presplitting blasting construction method
  • High slope presplitting blasting construction method
  • High slope presplitting blasting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] 1. Test of pre-splitting blasting construction method on high slope:

[0033] In the excavation test of a certain highway engineering project and a high slope of a certain section of highway engineering, after using the high slope pre-splitting blasting construction method, the effect has been affirmed by the construction unit. The evaluation of the construction cost of the anchor bolt hanging net support in the later period and the ability to reduce the construction cost.

[0034] The high slope pre-splitting blasting construction method is characterized in that it comprises the following steps:

[0035] Step A: preparation of the slope pre-splitting blasting construction plan;

[0036] Step B: making the guide frame and erecting the guide frame;

[0037] Step C: Drilling the pre-split hole 9 and the main blast hole;

[0038] Step D: filling the pre-split hole 9 with medicine;

[0039] Step E: Connect the detonation network and perform pre-splitting blasting;

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a high slope presplitting blasting construction method which comprises the following steps of compiling a slope presplitting blasting construction scheme, manufacturing a guide frame, erecting the guide frame, drilling a presplitting hole and a main blasting hole, charging powder into the presplitting hole, connecting a detonating network, carrying out presplitting blasting, and measuring the gradient of a slope by using a slope measuring device. According to the high slope presplitting blasting construction method, by arranging the guide frame, auxiliary positioning can be conducted on a drill rod, the precision degree of the drilling angle is guaranteed, so that over-excavation and under-excavation are better controlled, excavation is made to be within the design requirement range, the hidden danger that a high slope is prone to landslide is effectively prevented, and meanwhile, the straightness of the slope is guaranteed; bamboo chips are arranged in the pre-splitting hole, and an explosive cartridge is isolated from the slope surface, so that the impact effect on the slope surface in the detonating process is reduced, and the stability of the slope is guaranteed; and the slope measuring device is arranged, so that the vertical angle of the slope can be conveniently measured.

Description

technical field [0001] The invention relates to the technical field of high slope blasting construction. Specifically, it is a high slope pre-splitting blasting construction method. Background technique [0002] The blasting construction process involves a lot of content, among which blasting excavation with multiple steps on high slopes is a difficult point in engineering construction, especially in special environments such as complex terrain of the excavation line and large surface undulations, the traditional processing method is in On the edge of the pre-splitting design, the drilling angle is preliminarily estimated using the drilling rig inclination method, and the accuracy is poor. Overbreak and undercut are obvious in the blasting treatment area, and post-processing is difficult. After that, the stability of the slope is difficult to guarantee; and after the blasting, the traditional slope measurement device cannot be used to measure the slope conveniently, and whe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): F42D1/00F42D1/08
CPCF42D1/00F42D1/08Y02A10/23
Inventor 单瑞金韩宇英罗春德崔朝辉何利清张富起石小军张宇夫赵丽军惠云霞董苹郭慧勤赵副全郭城田敏刘伟
Owner 包头市公路工程股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products