PGM-48 type steel rail grinding wagon electrical control system
An electrical control system and rail grinding car technology, applied in the mechanical field, can solve problems such as idle equipment, poor reliability, and outdated technology
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The present invention will be further described below in conjunction with drawings and embodiments.
[0013] Such as figure 1 , The electrical control system of the grinding car is developed on the basis of the large-scale road maintenance machinery network control platform of Zhuzhou CSR Times Electric Co., Ltd. The control system of the whole vehicle is composed of the subsystems of 3 vehicles connected by local Ethernet, and the network control system of each vehicle is composed of a distributed electrical system based on the expansion of multiple CAN bus modules to complete the control of all electrical signals. Control and feedback collection to achieve the purpose of mechanical, electrical and hydraulic control. The control subsystem of each car is functionally divided into a grinding operation control system and a hydraulic travel control system.
[0014] Such as figure 2 , No. I car and No. 3 car of PGM-48 rail grinding car each have 4 hydraulic pumps direct...