Regional energy internet integration system and method for optimizing configuration and operation thereof
An energy Internet and integrated system technology, applied in the field of regional energy Internet integrated systems, can solve problems such as not studying energy and information fusion schemes, not analyzing the matching degree of load characteristics and energy characteristics, and not studying the free access of energy modules.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0358] Taking a community in a large city as an example, the community is equivalent to the power supply capacity of a 35KV transformer below 10MW. The feasibility analysis of regional energy Internet project construction in this community is as follows:
[0359] 1. Project background
[0360] The air-conditioning cooling load of hotels in the community is about 9711kW, and the air-conditioning heating load is 2954kW. Among them, the basic cooling load and basic heating load are about 4000kW and 1000kW respectively, and the peak-shaving cooling load and peak-shaving heating load are about 6000kW and 2000kW; the basic load operation time is about 14 hours, and the peak load operation time is about 10 hours . The annual average monthly electricity load of the hotel is between 842kW and 1875kW, and the load has obvious seasonal characteristics. The average electricity load in August is more than 100% higher than that in March. The peak power load of the hotel in spring, autumn...
Embodiment 2
[0405] Operation of Regional Energy Internet Integrated System
[0406] An area configured with the regional energy Internet integrated system of the present invention is provided, specifically a community configured with the regional energy Internet integrated system described in Embodiment 1. Before the operation of the regional energy Internet integrated system, based on the energy demand of the community, provide N alternative operation schemes for the regional energy Internet integrated system; based on the operation-related parameters, calculate the N alternatives respectively The running cost value of Y 1 ~Y N ; For the N alternatives, compare their respective running cost values Y, and determine the corresponding min The scheme is used as the best alternative operation scheme; according to the best alternative operation scheme, the regional energy Internet integrated system is operated.
[0407] Consider the following factors:
[0408] The installed capacity of p...