Underground pipeline system
An underground pipeline and pipeline technology, applied in tunnel systems, roads, tracks, etc., can solve the problem of large space occupation, and achieve the effect of increasing the cargo volume, large space, and alleviating urban traffic congestion.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] The material of the pipe 1 is steel or concrete, and the cross section is circular; a track set is set in the round pipe 1. At this time, the track set includes: the first track and the second track, about the center of the round pipe 1. Lines are symmetrical, the material of the first and second running rails is steel; the first and second running rails are fixed to the pipe 1 by fasteners or welding, or the first running rail and the second running rail and The pipeline 1 is made by integral molding. Because the logistics transport vehicle 4 itself has a certain weight, the structure requirements of the running rail 2 and the pipeline 1 are relatively high when the full load of goods is transported, and the overall strength of the steel pipeline 1 and the running rail 2 And the rigidity is relatively high, which can meet the suspension and transportation requirements of the logistics transport vehicle 4 and ensure good structural stability. The steel pipeline 1 has goo...
Embodiment 2
[0050] See attached Picture 10 , The material of the pipe 1 is steel or concrete, and the cross section is elliptical; in the elliptical pipe 1, there are two running rail groups, one of which includes: the third running rail 20 and the fourth running rail, and the other running rail group Including: the fifth track and the sixth track 21. The third running rail 20 and the sixth running rail 21 are symmetrically arranged on both sides of the top of the elliptical pipe 1. The fourth running rail and the fifth running rail are fixed at the middle of the top of the elliptical pipe 1. The fourth running rail and the fifth running rail The rails can be arranged independently, or the fourth running rail and the fifth running rail can be integrated. The material of the running rail set and the connection method with the pipe 1 in this embodiment are the same as those in the first embodiment. The provision of two running track groups can realize the parallel operation of the logistic...
Embodiment 1
[0059] See attached image 3 with 4 , The bogie 5 includes: a frame 7, a suspension pin 13, a pin shaft 8, a number of hub motors 11 and a number of wheels 10; a pin hole is opened in the middle of the frame 7; the suspension pin 13 is suspended in the pin hole, and a shaft hole is opened in the lower part; Set in the shaft hole for hanging the vehicle body 6; a number of in-wheel motors 11 are symmetrically arranged on both sides of the top of the frame 7 with respect to the center line of the frame 7; the in-wheel motors 11 are fixedly connected to the frame 7; a number of wheels 10 are arranged in the corresponding hub motors 11 output end; the radial cross section of the wheel 10 is perpendicular to the rail surface 18 of the running rail 2.
[0060] The wheels 10 on both sides of the bogie 5 are arranged in a figure eight shape. The weight of the car body 6 is transmitted to the two running rails 2 through the pin 8, the suspension pin 13, the frame 7, the hub motor 11 and th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com