Installation and construction method of vertical pipe in pipe well
A construction method and tube well technology, which are applied in the directions of pipes/pipe joints/pipe fittings, transportation and packaging, pipe laying and maintenance, etc., can solve the problems of difficult alignment of pipe sections, difficult transportation of pipe sections, and low welding efficiency, etc. Ensure alignment and verticality, avoid operation safety accidents, and ensure the effect of welding quality and efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0031] A pipe well riser installation and construction method, the method is used for vertical installation of a riser formed by butt jointing of multiple pipe sections in a pipe well, the riser includes N pipe sections, and is from the top to the bottom of the riser, The N pipe sections are respectively pipe section 1, pipe section 2, pipe section 3, ..., pipe section N, and the method includes the following steps carried out in sequence:
[0032] S1. Install the hoist: install the main hoist and auxiliary hoist in the tube well;
[0033] S2. Hoisting the pipe section: lift the pipe section 1 from the bottom of the pipe well through the main hoist, and make the height value from the bottom of the pipe section 1 to the bottom of the pipe well greater than the length of the pipe section 2;
[0034] The pipe section 2 is lifted from the bottom of the tube well by the auxiliary hoist, and the upper end nozzle of the pipe section 2 is welded to the lower end nozzle of the pipe sec...
Embodiment 2
[0045] This embodiment is further limited on the basis of Embodiment 1: in order to obtain an ideal manual welding operation space or set up automatic welding equipment at a specific position in the pipe well to achieve high-quality and high-efficiency docking of pipe sections, in step S2, each pipe section When docking with the upper pipe section, the docking positions are all located at the same position in the tube well.
[0046] In step S2, when all pipe sections have not been docked in one continuous working cycle, the lower end of the connected riser section is released to the bottom support of the pipe well by operating the main hoist, and the connected pipe is lifted by the main hoist in the next continuous working cycle. After the riser section, the butt joint of subsequent pipe sections is carried out. With this scheme, the continuous working cycle can be understood as a day or a construction shift. For example, when the construction is completed on the same day, the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com