Unlock instant, AI-driven research and patent intelligence for your innovation.

A prefabricated integrated pipe gallery spliced ​​with cast-in-place hidden beams and laminated slabs and its construction method

A comprehensive pipe gallery and prefabricated assembly technology, which is applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of unsafe waterproofing at joints, difficult transportation and hoisting, and structural damage at joints, so as to facilitate construction, hoisting, Easy to transport and hoist, reduce the effect of self-weight

Active Publication Date: 2020-06-26
中建五局第三建设有限公司
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The integral prefabricated pipe gallery has the advantages of good integrity and simple installation process, but there are problems such as large size and weight of a single section, difficult transportation and hoisting, and waterproof joints are not safe.
However, most of the existing prefabricated pipe gallery structures have poor integrity due to the large number of assembled components, and are prone to defects such as structural damage at the joints, damage to sealing materials, or aging of the pipe gallery, resulting in water seepage in the pipe gallery.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A prefabricated integrated pipe gallery spliced ​​with cast-in-place hidden beams and laminated slabs and its construction method
  • A prefabricated integrated pipe gallery spliced ​​with cast-in-place hidden beams and laminated slabs and its construction method
  • A prefabricated integrated pipe gallery spliced ​​with cast-in-place hidden beams and laminated slabs and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The specific implementation of a prefabricated integrated pipe gallery spliced ​​with cast-in-place concealed beams and laminated slabs and its construction method will be described in detail below in conjunction with the accompanying drawings and specific examples.

[0041] Such as Figure 1 to Figure 9 As shown, a prefabricated integrated pipe gallery spliced ​​with cast-in-place concealed beams and laminated slabs includes a multi-section integrated pipe gallery body. The two ends and the middle part of the cast-in-place bottom plate 1 are reserved with U-shaped ribs 5 on the side facing the full prefabricated partition wall, and the upper and lower ends of the full prefabricated partition wall 2 are equipped with U-shaped ribs. Type inserting ribs 5, the cast-in-place bottom plate 1 and the fully prefabricated partition wall 2 are overlapped and connected by U-shaped inserting ribs 5, and the two ends and the middle part of the superimposed top plate 3 are respectiv...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a cast-in-place hidden beam and superimposed plate splicing prefabricated assembly type comprehensive pipe gallery and a construction method for the cast-in-place hidden beam and superimposed plate splicing prefabricated assembly type comprehensive pipe gallery. The comprehensive pipe gallery comprises a plurality of comprehensive pipe gallery bodies, and each comprehensivepipe gallery body is formed by splicing a cast-in-place bottom plate, fully-prefabricated partition walls and a superimposed top plate. The construction method comprises the steps of prefabricated component fabricating, positioning and line placing, bottom plate steel bar binding, bottom plate casting, maintaining and mold releasing, then prefabricated component assembling, splicing joint steel bar and moldboard installing and splicing and cast-in-place part concrete casting, and the prefabricated assembly integral type concrete comprehensive pipe gallery is formed. By means of the cast-in-place hidden beam and superimposed plate splicing prefabricated assembly type comprehensive pipe gallery and the construction method for the cast-in-place hidden beam and superimposed plate splicing prefabricated assembly type comprehensive pipe gallery, the advantages of prefabricating and cast-in-place processes are colligated, the own weight of the prefabricated components can be reduced through reasonable separation, construction hoisting is facilitated, all components can also be connected into a whole by casting the cast-in-place hidden beams in place, and under the premise that the overallbearing capacity and deformation capacity of the comprehensive pipe gallery are not reduced, the prefabricating and assembling problems of multi-cabin pipe galleries and pipe gallery non-standard sections can be solved.

Description

technical field [0001] The invention relates to a prefabricated integrated pipe gallery spliced ​​with cast-in-situ concealed beams and laminated slabs and a construction method thereof. Background technique [0002] The urban underground comprehensive utility gallery is an underground space structure where various pipelines such as electric power, communication, gas, water supply, and drainage are concentrated. It solves the traffic congestion caused by the "zip link", avoids the "spider web" in the air, plays a positive role in improving the overall image of the city and creating a harmonious ecological environment in the city, and has attracted great attention from all over the country. [0003] The traditional all-in-place pipe gallery construction method requires processes such as steel bar processing and binding, formwork support, concrete pouring, maintenance, and formwork removal for the overall structure of the pipe gallery on the construction site. Not only is the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/045
CPCE02D29/045E02D29/10
Inventor 陈昊何昌杰员恺
Owner 中建五局第三建设有限公司