Embodiment 1
[0033] Such as figure 1 and figure 2 As shown, a permeable brick pavement structure includes a brick layer 1, a bearing layer 2, and a base layer 3 from top to bottom. The brick layer 1 is formed by laying and splicing several brick bodies 11. Only one brick body 11 is shown in the figure The base layer 3 is the ground surface soil layer of the construction site, and a plurality of installation boxes 4 are embedded in the base layer 3. figure 1 Only one installation box 4 is shown in the figure, the top of the installation box 4 has an opening, the installation box 4 has a partition 41 arranged parallel to its bottom surface, and a shelf plate 42 is detachably installed on the top of the partition 41, and the bearing layer 2 is placed In the space between the partition plate 41 and the frame plate 42 , the brick layer 1 is laid on the frame plate 42 .
[0034] combine image 3 As shown, the installation box 4 is made of metal materials. In this embodiment, it is mainly mad...
Embodiment 2
[0041] A construction technique for a permeable brick pavement, applied to the permeable brick pavement structure in Construction Example 1, comprising the following steps:
[0042] S1, base 3 construction.
[0043] Select the construction site, dig out the installation groove 8 at the soil layer of the ground surface according to the terrain after measuring and positioning, and place a plurality of installation boxes 4 in the installation groove 8, thereby assembling the prototype of the sidewalk; A gap 81 is reserved on one side, and the side of the installation box 4 with the water outlet hole 43 fits the side where the gap 81 is located, so that the water outlet hole 43 is exposed outside the installation groove 8 through the gap 81; the installation box 4 is placed and backfilled with soil, And concrete is poured in the gap between the installation box 4 and the soil layer, thereby improving the firmness of the installation box 4 after being buried.
[0044] S2, the constr...