BIM-based actual data processing method of engineering project construction

A technology of actual data and engineering projects, which is applied in the field of processing actual data of engineering projects, can solve the problems of unsatisfactory information collection accuracy, inapplicable information management, and poor data sharing, so as to realize automatic data collection and improve labor efficiency. Productivity, the effect of quick comparison

Inactive Publication Date: 2018-08-17
HUNAN CONSTR ENG GRP COR
View PDF2 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a BIM-based engineering project for the existing engineering project management system with low integration, unsatisfactory information collection accuracy, poor data sharing, inconvenient application, and inapplicability to the overall information management of enterprises. Construction of the actual data processing method, use the WeChat applet to complete the project data, information, and progress reporting, and at the same time give feedback on the inspection and rectification requirements of the management group, and finally all the data are included in the platform database, and analyzed and summarized on the big screen through cloud computing. end, so as to promote the promotion of construction project information, and then feed back to the project itself, improve the quality of the project, and accelerate the construction progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based actual data processing method of engineering project construction
  • BIM-based actual data processing method of engineering project construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] In order to make the technical means and implementation purposes of the present invention easier to understand, the present invention will be further stated below in conjunction with specific embodiments:

[0040] According to the current 2013 housing construction and decoration engineering quantity calculation specification (national standard), the 2014 Hunan Provincial Construction Engineering, Decoration Engineering, and Installation Engineering Consumption Standards, in accordance with the relevant documents of Hunan Construction Price, combined with the project construction scale and structure type, Form BIM modeling technical standards, and at the same time, form guidance on project list pricing standards based on project construction contract attributes and related charging standards. According to the BIM modeling technical standards and the guidance on project list pricing standards, complete the creation of project BIM models and the preparation of pricing docum...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM-based actual data processing method of engineering project construction. The method comprises: step one, project model creation is carried out; to be specific, centralizedmodeling of a project is carried out, a project cost file is compiled in a unified manner, project amount calculation and cost calculation are standardized, project settlement work is controlled comprehensively, and a digital file base including a tracking model base, a price database, a quota database, and a supply library is established; and step two, management platform establishment is carried out; to be specific, a big data management platform and a project information management system of a WeChat applet are developed, a management mode of a background and a project front end is established, and data sharing of the existing related financial system data, the project model, and the project information management system is realized based on protocol inter-communication. With the method provided by the invention, the project construction process can be reflected timely, comprehensively, and accurately; the work flow is optimized; and the information management becomes visual and simple.

Description

technical field [0001] The invention relates to a construction project data information management method, in particular to a BIM-based processing method for construction project actual data. Background technique [0002] my country's construction industry has experienced continuous rapid development for many years, and the technical level in all aspects is also constantly improving, especially in the application of information technology to improve the overall management level of the construction industry. After more than ten years of comprehensive promotion of information construction, its progress mainly reflects In the establishment of professional websites, the application of software, the construction of the internal LAN of construction enterprises, and the information system of construction enterprises, certain technical achievements have been made, but the actual application of information technology in the project management process is not high, and the construction i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q50/08
CPCG06Q50/08
Inventor 陈浩朱峰郑朝龄张静
Owner HUNAN CONSTR ENG GRP COR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products