BIM-based actual data processing method of engineering project construction

A technology of actual data and engineering projects, which is applied in the field of processing actual data of engineering projects, can solve the problems of unsatisfactory information collection accuracy, inapplicable information management, and poor data sharing, so as to realize automatic data collection and improve labor efficiency. Productivity, the effect of quick comparison
CN108416701AInactive Publication Date: 2018-08-17HUNAN CONSTR ENG GRP COR

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
HUNAN CONSTR ENG GRP COR
Publication Date
2018-08-17
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention provides a BIM-based actual data processing method of engineering project construction. The method comprises: step one, project model creation is carried out; to be specific, centralizedmodeling of a project is carried out, a project cost file is compiled in a unified manner, project amount calculation and cost calculation are standardized, project settlement work is controlled comprehensively, and a digital file base including a tracking model base, a price database, a quota database, and a supply library is established; and step two, management platform establishment is carried out; to be specific, a big data management platform and a project information management system of a WeChat applet are developed, a management mode of a background and a project front end is established, and data sharing of the existing related financial system data, the project model, and the project information management system is realized based on protocol inter-communication. With the method provided by the invention, the project construction process can be reflected timely, comprehensively, and accurately; the work flow is optimized; and the information management becomes visual and simple.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a construction project data information management method, in particular to a BIM-based processing method for construction project actual data. Background technique

[0002] my country's construction industry has experienced continuous rapid development for many years, and the technical level in all aspects is also constantly improving, especially in the application of information technology to improve the overall management level of the construction industry. After more than ten years of comprehensive promotion of information construction, its progress mainly reflects In the establishment of professional websites, the application of software, the construction of the internal LAN of construction enterprises, and the information system of construction enterprises, certain technical achievements have been made, but the actual application of information technology in the project management process is not high, and the construction i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine