Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Temporary and quick construction method based on BIM

A construction method and project technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as difficulty in normal use, low construction efficiency, and lack of unified design, so as to improve application planning efficiency and avoid material waste. , the effect of avoiding cost waste

Pending Publication Date: 2018-09-11
ZHONGTIAN NORTHWEST CONSTR INVESTMENT GRP CO LTD +1
View PDF4 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the prior art, the construction method of the temporary construction is to prepare the construction materials first, and then build the peripheral structure of the temporary construction. The construction is carried out in the order of: base-wall-column-ground construction. There is no unified design, so when a temporary situation occurs It is inconvenient to adjust, and there is a lot of waste of materials. The same construction team repeatedly enters the site, and the construction efficiency is low
[0004] The existing Chinese patent document CN105569378A discloses a steel structure temporary board house structure and construction technology. The main problem to be solved is: the positioning stability of the household equipment inside the board house is relatively poor, which causes a large problem for normal use. At the same time, the current steel structure board house itself does not have any safety protection measures and the structural strength of the board house itself is relatively poor, especially the ability to protect against fire is extremely poor, so it also causes the current steel structure board house The use security and stability are low, which seriously threatens the personal safety of users

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary and quick construction method based on BIM
  • Temporary and quick construction method based on BIM
  • Temporary and quick construction method based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0053] Such as Figure 5-8 It is the temporary construction guidance drawing of Vanke Runyuan Project, which is described in the form of a schematic diagram of the material construction scope, a plane positioning diagram and a three-dimensional node detailed diagram.

[0054] Such as Figure 9-15 The construction personnel achieved the goal of precise positioning, orderly material preparation, and one-time survival of the same material during the temporary construction process according to the drawings.

[0055] Figure 9 Layout renderings for the site;

[0056] Figure 10 For stage 1: large sample in front of the container in the office area;

[0057] Figure 11 It is the large sample in front of the container in the living area of ​​Section 1;

[0058] Figure 12 Stage 2: Construction samples of corridor bricks and steel springboards;

[0059] Figure 13 Stage 2: Construction details of drainage ditches and walkway bricks;

[0060] Such as Figure 14-15 , for the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a temporary and quick construction method based on BIM. The method comprises the steps of categorization and grouping of a temporary construction modular family library, construction and information addition of the family library, filtration on same materials by utilizing shared parameters, extraction of engineering quantities and plotting. The method has the advantages that temporary construction node detail drawing methods are adopted in a family to form a componentized family, after the componentized family is placed, the arrangement condition of the different materials in a site can be checked according to setting in the family and projects, the precision of a model can be greatly increased on the basis of improving the work efficiency of a BIM modeler, and therefore the purposes of precise positioning, inserted construction and one-time forming of the same materials are achieved.

Description

technical field [0001] The invention relates to a temporary construction method, in particular to a BIM-based temporary construction fast construction method. Background technique [0002] Temporary construction refers to the temporary buildings, structures and other temporary facilities for life and production that must be erected by construction enterprises for engineering construction. It refers to the simple and temporary buildings, structures and other facilities that must be demolished within a limited period, and the temporary buildings have a specified period of use. [0003] In the prior art, the construction method of the temporary construction is to prepare the construction materials first, and then build the peripheral structure of the temporary construction. The construction is carried out in the order of: base-wall-column-ground construction. There is no unified design, so when a temporary situation occurs It is inconvenient to adjust, and there is a lot of wa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
CPCG06F30/13G06F30/20
Inventor 赵向东巨鹏赵军华陈泽淼白腾飞孙红
Owner ZHONGTIAN NORTHWEST CONSTR INVESTMENT GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products