Scheduling plan generation method based on multi-level rolling time domain and multi-item
A scheduling plan and rolling time-domain technology, applied in the field of resource constraints in the remanufacturing industry, can solve problems such as constrained resource utilization, underutilization, and SDS time not considered
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute a conflict with each other.
[0052] The scheduling plan generation method based on multi-level rolling time domain and multi-item provided by the present invention, its flow refers to figure 1 ; The method for generating a scheduling plan based on multi-level rolling time domain and multi-item provided by the embodiment, its process refers to figure 2 , including the following steps:
[0053] (1) Take the customer multi-...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com