Comprehensive treatment method for coastal saline alkali soil
A technology for comprehensive treatment of saline-alkali soil, applied in the field of comprehensive treatment of coastal saline-alkali soil, can solve problems such as damage to the root system of crops, high salt content, and growth of seedlings, and achieve the effect of improving fertility
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] A comprehensive treatment method for coastal saline-alkali soil, comprising the following steps:
[0024] (1) Topsoil eradication (remove the deep salt to the soil surface): After the summer rain, lay a layer of wet thin sponge on the soil surface of the saline-alkali land, expose it to the sun for 2 days, and evaporate the salt in the soil to accumulate on the soil surface. Then remove the soil at a depth of 0-3cm from the surface;
[0025] (2) Concealed pipe drainage: Install a concealed pipe every 8m on the saline-alkali ground. The concealed pipe is installed at a position 6m deep from the soil surface. Small holes are evenly distributed on the concealed pipe, and the outside of the small hole is wrapped with non-woven fabric , used to remove the soil salinity in the profile, and the drainage of the underground pipe depends on natural rainfall;
[0026] (3) Surface drainage: Part of the salt cannot reach the position of the hidden pipe, and returns to the soil surf...
Embodiment 2
[0029] A comprehensive treatment method for coastal saline-alkali soil, comprising the following steps:
[0030] (1) Topsoil eradication (remove the deep salt to the soil surface): After the summer rain, lay a layer of wet thin sponge on the soil surface of the saline-alkali land, expose it to the sun for 3 days, and evaporate the salt in the soil to accumulate on the soil surface. Then remove the soil at a depth of 0-3cm from the surface;
[0031] (2) Concealed pipe drainage: Install a concealed pipe every 7.5m on the saline-alkali ground. The concealed pipe is installed at a position 5.5m deep from the soil surface. Cloth wrapping is used to remove the salinity of the profile soil, and the drainage of the underground pipe depends on natural rainfall;
[0032] (3) Surface drainage: part of the salt cannot reach the position of the hidden pipe, and returns to the soil surface with the evaporation of soil water, causing the soil to return to salt. Therefore, this part of the s...
Embodiment 3
[0035] A comprehensive treatment method for coastal saline-alkali soil, comprising the following steps:
[0036] (1) Topsoil eradication (remove the deep salt to the soil surface): After the summer rain, lay a layer of wet thin sponge on the soil surface of the saline-alkali land, expose it to the sun for 2 days, and evaporate the salt in the soil to accumulate on the soil surface. Then remove the soil at a depth of 0-3cm from the surface;
[0037] (2) Concealed pipe drainage: Install a concealed pipe every 8.5m on the saline-alkali ground. The concealed pipe is installed at a position 6.5m deep from the soil surface. Cloth wrapping is used to remove the salinity of the profile soil, and the drainage of the underground pipe depends on natural rainfall;
[0038] (3) Surface drainage: Part of the salt cannot reach the position of the hidden pipe, and returns to the soil surface with the evaporation of soil water, causing the soil to return to salt. Therefore, this part of the s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com