Construction method of roller compacted concrete road for slope protection
A technology of roller compacted concrete and construction method, which is applied in the field of building construction, and can solve problems such as short service life and poor protection ability of slope protection, and achieve the effects of increasing service life, increasing support strength, and increasing strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] The invention provides a construction method for a slope protection roller compacted concrete road, comprising the following steps:
[0031] S1. Construction preparation, use the access roads on both sides of the bank to excavate and build a temporary road for the foundation pit, which will be used as the main construction road for the transportation of formwork, concrete and other materials during concrete construction;
[0032] S2. Measurement and setting out. After the slope protection working face comes out, the slope is positioned and set out, and the position line of the foot protection and the slope angle line of the platform are determined;
[0033] S3, base soil ingredients, clay mixed with lime is used to prepare the base soil, the ratio of clay to lime is 6:1, the clay and lime are prepared by mechanical stirring, the stirring temperature is 15°C, and the stirring time is 0.6 hours;
[0034] S4, foundation soil laying, at first slope protection is carried out...
Embodiment 2
[0043] The invention provides a construction method for a slope protection roller compacted concrete road, comprising the following steps:
[0044] S1. Construction preparation, use the access roads on both sides of the bank to excavate and build a temporary road for the foundation pit, which will be used as the main construction road for the transportation of formwork, concrete and other materials during concrete construction;
[0045] S2. Measurement and setting out. After the slope protection working face comes out, the slope is positioned and set out, and the position line of the foot protection and the slope angle line of the platform are determined;
[0046] S3. Base soil ingredients, clay mixed with lime is used to prepare the base soil, the ratio of clay to lime is 6:1, the clay and lime are prepared by mechanical stirring, the stirring temperature is 45°C, and the stirring time is 1.4 hours;
[0047]S4, foundation soil laying, at first slope protection is carried out ...
Embodiment 3
[0056] The invention provides a construction method for a slope protection roller compacted concrete road, comprising the following steps:
[0057] S1. Construction preparation, use the access roads on both sides of the bank to excavate and build a temporary road for the foundation pit, which will be used as the main construction road for the transportation of formwork, concrete and other materials during concrete construction;
[0058] S2. Measurement and setting out. After the slope protection working face comes out, the slope is positioned and set out, and the position line of the foot protection and the slope angle line of the platform are determined;
[0059] S3. Base soil ingredients. The base soil is prepared by mixing clay with lime. The ratio of clay to lime is 6:1. Mechanical stirring is carried out during the preparation of clay and lime. The stirring temperature is 16°C and the stirring time is 0.7 hours;
[0060] S4, foundation soil laying, at first slope protecti...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com