Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method for soft soil roadbed high fill steep slop road foam light soil

A foam lightweight soil and soft soil subgrade technology, which is applied in infrastructure engineering, roads, roads, etc., can solve problems such as difficulty in preventing longitudinal cracking of the road surface, and achieve the effects of small bulk density, simple installation, and reduced settlement

Inactive Publication Date: 2018-11-13
广西驰胜农业科技有限公司
View PDF6 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] However, the current construction method of foam concrete is too simple to prevent longitudinal cracking of the pavement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] The construction method of the foam light soil in the high filling steep slope section of the soft soil subgrade comprises the following steps:

[0030] (1) Excavation of the base: the lateral distance of the outer edge of the excavated foundation trench is > 2m, and the transverse width of the base of the light soil construction area is > 3m. The slope of the reconstruction and expansion project has been formed, so control The slope ratio of slope cutting is 1:1, and each step is made into a transverse slope with an inclination of 2%; the base is required to have no water accumulation and no soft soil, and unscreened gravel shall be filled with over-excavation of 30cm according to the design elevation of foam light soil; Block the water supply channel, lay a layer of anti-seepage geomembrane on the top surface of unscreened gravel at the base, and set water outlets to drain outwards, so as to prevent water from stagnant on both sides of the filled light soil; The anti-...

Embodiment 2

[0044] The construction method of the foam light soil in the high filling steep slope section of the soft soil subgrade comprises the following steps:

[0045] (1) Excavation of the base: the lateral distance of the outer edge of the excavated foundation trench is > 2m, and the transverse width of the base of the light soil construction area is > 3m. The slope of the reconstruction and expansion project has been formed, so control The slope ratio of slope cutting is 1:1, and each step is made into a transverse slope with an inclination of 2%; the base is required to have no water accumulation and no soft soil, and unscreened gravel shall be filled with over-excavation of 30cm according to the design elevation of foam light soil; Block the water supply channel, lay a layer of anti-seepage geomembrane on the top surface of unscreened gravel at the base, and set water outlets to drain outwards, so as to prevent water from stagnant on both sides of the filled light soil; The anti-...

Embodiment 3

[0059] The construction method of the foam light soil in the high filling steep slope section of the soft soil subgrade comprises the following steps:

[0060] (1) Excavation of the base: the lateral distance of the outer edge of the excavated foundation trench is > 2m, and the transverse width of the base of the light soil construction area is > 3m. The slope of the reconstruction and expansion project has been formed, so control The slope ratio of slope cutting is 1:1, and each step is made into a transverse slope with an inclination of 2%; the base is required to have no water accumulation and no soft soil, and unscreened gravel shall be filled with over-excavation of 30cm according to the design elevation of foam light soil; Block the water supply channel, lay a layer of anti-seepage geomembrane on the top surface of unscreened gravel at the base, and set water outlets to drain outwards, so as to prevent water from stagnant on both sides of the filled light soil; The anti-...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction method for soft soil roadbed high fill steep slop road foam light soil. The construction method for the soft soil roadbed high fill steep slop road foam light soil comprises the following steps of (1) excavation of a base; (2) construction of a pouring area, a pouring layer and a settlement joint: pouring a full-line foam light soil roadbed in a sectional, zoned and comprehensively layered manner; (3) laying requirements of a geomembrane and a geonet: the top of the foam light soil roadbed is sprayed with water or covered for curing in 7 days after beingpoured; and then the impermeable geomembance is laid on the top of the foam light soil roadbed; the impermeable geomembance at the top of the foam light soil roadbed is laid above a metal net; duringlaying, the splicing adopts a hot weld method; the splicing width is 5 cm; before laying, one layer of non-woven needle-punched geotechnical cloth is laid first as a pad; during laying, the non-wovenneedle-punched geotechnical cloth is flattened and tightened and then anchored by using a U-shaped nail; and the adjacent width of geomembance is overlaid and spliced on the impermeable geomembance; and (4) pouring of the light soil. According to the construction method for the soft soil roadbed high fill steep slop road foam light soil, the settlement caused by additional load in widened roadbedfilling can be reduced, the settlement between new and old roadbeds is eliminated, longitudinal cracks of a road surface are prevented, and broad market promotion values are realized.

Description

【Technical field】 [0001] The invention belongs to the field of road surface construction, and in particular relates to a construction method of foam light soil in a high filling steep slope road section of a soft soil roadbed. 【Background technique】 [0002] With the rapid development of my country's economy and the increasing traffic volume, the construction quality of highway engineering and urban road engineering has attracted much attention. During the construction, there will be problems such as the failure of normal grading and widening of the road sections along the river, ponds and soft soil, the poor stability of the subgrade in the high fill section of the soft soil subgrade, and the differential settlement of the subgrade, which will affect the use of the road surface. We use lightweight foam soil for filling. The use of foam lightweight soil in road filling construction has the following functions: [0003] (1) It can be filled vertically to reduce land use; ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01C3/00E01C3/04E02D15/02
CPCE01C3/00E01C3/04E02D15/02
Inventor 韩再满
Owner 广西驰胜农业科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products