Pavement multi-hammer rubblization construction method
A construction method and petrochemical technology, applied in the field of road multi-hammer petrochemical construction, can solve the problems of few types of roads and unstable petrochemical effect, achieve stable crushing effect, save roadbed materials and transportation costs , the effect of solving reflection cracks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] The pavement multi-hammer crushing construction method includes the following steps:
[0020] (1) Preparation before construction: Before construction, first remove the asphalt surface repair materials existing on the concrete slabs of all crushed road sections, and then dig out the original structural layer of the hard shoulder of the crushed road section to the same height as the concrete pavement base. Horizontal drainage blind ditches shall be set up at the low sides of the superelevation sections of vertical curves and horizontal curves and all other areas with drainage problems, and the original steel guardrails shall be removed at the same time;
[0021] (2) Set up the test section: before the pavement crushing construction officially starts, select a road surface with a length ≥ 60m and a width of 5m as the test section in a representative section, and set the height of the drop hammer to 1.25m and the distance between the drop hammers to 10cm And the working sp...
Embodiment 2
[0030] The pavement multi-hammer crushing construction method includes the following steps:
[0031] (1) Preparation before construction: Before construction, first remove the asphalt surface repair materials existing on the concrete slabs of all crushed road sections, and then dig out the original structural layer of the hard shoulder of the crushed road section to the same height as the concrete pavement base. Horizontal drainage blind ditches shall be set up at the low sides of the superelevation sections of vertical curves and horizontal curves and all other areas with drainage problems, and the original steel guardrails shall be removed at the same time;
[0032](2) Set up the test section: before the pavement crushing construction officially starts, select a road surface with a length ≥ 60m and a width of 5m in a representative section as the test section, set the drop hammer height to 1.27m, and the drop hammer distance to 10cm And the working speed is 1.2m / min. Adjust ...
Embodiment 3
[0041] The pavement multi-hammer crushing construction method includes the following steps:
[0042] (1) Preparation before construction: Before construction, first remove the asphalt surface repair materials existing on the concrete slabs of all crushed road sections, and then dig out the original structural layer of the hard shoulder of the crushed road section to the same height as the concrete pavement base. Horizontal drainage blind ditches shall be set up at the low sides of the superelevation sections of vertical curves and horizontal curves and all other areas with drainage problems, and the original steel guardrails shall be removed at the same time;
[0043] (2) Set up the test section: before the pavement crushing construction officially starts, select a road surface with a length ≥ 60m and a width of 5m in a representative section as the test section, set the drop hammer height to 1.30m, and the drop hammer distance to 10cm And the working speed is 1.2m / min. Adjust...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com