Construction method of wall structure of green subgrade pile plate
A green, roadbed technology, applied in infrastructure engineering, sheet pile walls, botanical equipment and methods, etc., can solve the problems of low construction efficiency, prone to instability, low construction efficiency of roadbed filling, etc. Solve the effect of low construction efficiency and ensure stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Below in conjunction with accompanying drawing and embodiment the present invention is further described:
[0035] refer to figure 1 , green subgrade pile-slab wall structure, including reinforcement piles 1 horizontally arranged on the rock foundation, two adjacent reinforcement piles 1 are hung with soil retaining boards 2, and filling soil 4 is filled in layers behind them. refer to Figure 4 and Figure 5 , on the two adjacent reinforcement piles 1, the greening groove structure 3 is hung vertically at intervals, the rear part 31 and the front part 32 of the greening groove structure 3 form a card groove structure 33 on both lateral sides, and the front part 32 is arranged to accommodate nutrition Soil 5 and plant the greening groove of green plant 6. refer to figure 2 and image 3 , the cross-section of the reinforcement pile 1 below the ground line D is rectangular, and the two sides of the outer end above the ground line D have flange structures 11 protrudi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


