Optimization scheduling method for ring spinning process in spinning workshop
A production process and optimization scheduling technology, applied in the direction of artificial life, biological models, instruments, etc., can solve the problems of low economic benefits, waste of factory costs, long time loss, etc., to reduce waste of production costs, save production time, The effect of improving production efficiency and economic benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Embodiment 1: as Figure 1-6 As shown, an optimal scheduling method for the production process of the ring spinning process in the spinning workshop, by determining the scheduling model and optimization objectives of a batch of spinning raw materials to be processed in the ring spinning process, and using an improved method based on The optimization scheduling method of the firefly algorithm optimizes the target; among them, the scheduling model is established according to the processing time of each batch of raw materials on each textile processing machine in the ring spinning production, and the optimization objective is to minimize the maximum completion time C max (π):
[0043]
[0044]
[0045]
[0046]
[0047] C max (π)=C(π n ,m)
[0048]
[0049] In the formula, n × m represents the scale of the problem, n represents the total number of spinning raw materials or semi-finished products, m represents the number of equipment or machines used for...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


