Waste concrete pipeline penetration drilling pile construction process
A technology of discarded concrete and construction technology, applied in sheet pile walls, foundation structure engineering, construction, etc., to achieve high mechanization, prevent hole channeling, and good economical effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0045] 1. Design situation
[0046] The main foundation pit of the station has a total length of 155 meters. The foundation pit is supported by bored piles with a diameter of 1.2 meters @ 1.5 meters. The concrete pipeline is buried as deep as 9 meters (the depth of the pipe bottom). The pipeline construction method is the direct burial method. The overlying soil on the pipeline is mainly miscellaneous fill soil. The excavation method is risky and costly. It is finally decided to use various construction machinery such as rotary drilling rigs, punching drilling rigs, and hydraulic vibratory hammers to cooperate with construction methods to crush waste concrete pipes, effectively solving technical problems, and making a summary Form this process.
[0047] 2. Construction of bored piles crossing abandoned concrete pipes
[0048] (1) steel casing installation
[0049] The overlying soil above the abandoned concrete pipe is mainly miscellaneous fill. During the process of breaki...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com